Your Intergift 2027 stand depends on your space: in the Home & Design, Deco and Gifts areas, exhibitors under 50 m² are invoiced IFEMA’s Premium turnkey modular stand automatically, and only spaces over 50 m² can build an approved free-design stand. Intergift runs 3–6 February 2027 at IFEMA MADRID, and free-design projects are due in Zona Expo by 28 December 2026.

What are the key takeaways for Intergift 2027?
- Your contracted area decides your stand format before any designer does.
- The Intergift 2027 guide states that aluminium construction is not permitted in the Home & Design, Deco and Gifts halls.
- Free-design projects go to Zona Expo by 28 December 2026; Premium personalization by 13 January 2027.
- Services ordered from 21 January 2027 carry a 25% surcharge.
- Direct sales are forbidden, so the stand has to work as a showroom and an order desk.
Quick check: you booked 42 m² in the Deco area. Can you bring your own custom build?
Not by default. Under 50 m² the guide says the Premium turnkey modular stand is invoiced automatically, with no other stand type. The Commercial Management may exceptionally authorize free design under 50 m² for a special, differentiated project submitted through Zona Expo. Ask early, in writing.
By Adam Dragos, Exhibitor Success Specialist
Last updated: 9 November 2026
What is Intergift 2027 and who is it for?
Intergift is IFEMA Madrid’s trade-only fair for decoration, furniture and gifts. The 2027 edition runs Wednesday 3 to Saturday 6 February, 10:00 to 19:00, with exhibitor access from 8:30. Its official exhibitor guide groups the offer into four areas: Textile Editors and interior solutions, Home & Design, Deco and Gifts.
The source for every rule in this article is the organizer’s Intergift 2027 Exhibitor’s Guide and Specific Rules of Participation (version 7, read in November 2026). It sits alongside IFEMA MADRID’s general participation rules. If your contract or Zona Expo shows something different, the newer official document wins.
The sectors are broad. Home & Design covers sofas, furniture, lighting, outdoor decoration, home textiles and rugs. Deco covers decorative objects, flowers and plants, tableware, candles and fragrances, crafts and Christmas. Gifts covers souvenirs, personalized gifts, licensing, stationery, toys and gadgets. A digital event, Intergift liveconnect, is open from 15 January to 15 March 2027.
The fair is professional only. That shapes the stand brief more than it first appears. Your visitors are store buyers, distributors and specifiers deciding on collections, not shoppers carrying bags. The stand has to show range, explain terms and capture orders, all inside rules written for a dense, product-heavy hall.
Which stand can you have at Intergift 2027?
Your stand type follows your area and size. In Home & Design, Deco and Gifts, spaces under 50 m² automatically get the Premium turnkey modular stand. Spaces over 50 m² may book floor space only and build an approved free-design stand. Textile Editors work in 15 m² modules with their own turnkey stand. Minimum space is 16 m².
The guide is unusually direct on this point. It says companies under 50 m² in those three areas “will automatically be invoiced for the Premium turnkey modular stand, with no option to book any other type of stand.” It also says aluminium construction is not permitted in these halls, which is why only two options are listed there.
The Premium stand is a modular structure of chipboard panels painted in matt white. The free-design option is floor space only, and its design must be approved by IFEMA MADRID. There is one narrow exception. The Commercial Management may authorize free design under 50 m² for a company that presents a special design clearly differentiated from the modular stand.
The aluminium sentence matters to anyone planning a reusable system stand. Many modular exhibition systems use aluminium frames. If your plan depends on one, ask IFEMA’s Technical Secretariat in writing how that sentence applies to your hall and project before you commit to production. Do not assume an exception from a previous edition or another fair.
Textile Editors follow a separate route. Companies there request 15 m² modules (5 x 3 m), and the turnkey Textile Editors stand is invoiced automatically, with changes possible but no other stand type. Allocation for that area runs through a draw, with an €800 reservation fee that is not refunded if you do not take part.
Our view from the build side: decide the format question before anyone draws a render. A beautiful concept for 40 m² that needs an exception is a risk to the whole participation. A strong Premium layout that is approved on time is worth more than an ambitious design that arrives in Zona Expo too late. If you need help with the decision, discuss your stand brief with us.
What does the Premium turnkey stand include?
The Premium turnkey stand arrives built on 1 February 2027 from 8:30. It includes white-finish chipboard walls in a color you choose, mandatory trade-fair carpet, LED track spotlights at one per 3 m², an electrical panel prepared for 130 W/m², a storage room sized to your area and standard name lettering.
Storage scales with the plot. The guide lists a 1 x 1 m storage room up to 16 m², 2 x 1 m from 16.5 to 32 m², and 3 x 1 m from 32.5 m². From 16 m² the package also includes one table, three chairs, a 100 x 50 x 100 cm counter and a waste bin. Spaces from 16 m² get one car parking card for build-up, show days and dismantling, and daily stand cleaning is included.
Several choices close on 13 January 2027. You pick the wall color (white, black, grey, red or blue) and the carpet color (grey marl by default, or black, sahara, white or red). You enter the fascia name, limited to 20 characters; if you leave it blank, the stand is lettered with the fair name from your application. Any spotlight layout or storage position goes on the plan you upload to Zona Expo.
Three rules decide how far you can personalize it. Drilling the panels is not allowed, although nailing and adhesive tape are. Removing or replacing a standard element does not reduce the price. And all structural and electrical material is rented, so damage is invoiced at current rates.
The guide contains two dates for interior decoration projects on a modular stand. The stand-type sheet says projects with panels, profiles, totems, platforms or truss must be uploaded before 28 December; the rules page says the project must be updated by 13 January 2027. We plan to 28 December and treat 13 January as the last-change date, then confirm with the organizer.
For graphics, IFEMA offers its own stand graphics service, and any supplier you use must respect the no-drilling rule. Our artwork sign-off checklist helps you get files right the first time, which matters when the panel color and fascia are fixed weeks before you see the stand.
What rules apply to a free-design stand?
A free-design stand at Intergift 2027 is floor space only, over 50 m², with a project approved by IFEMA MADRID. Upload it to Zona Expo before 28 December 2026. Your builder pays assembly fees before starting, files the risk-prevention protocol, and works within the façade and overhang rules in the guide.
Start with the façade rule, because it shapes the whole plan. Blind perimeter walls may not exceed 70% of each façade facing an aisle. Longer closed walls must be set back at least 3 m from the façade and may not exceed 80% of its length. IFEMA MADRID interprets these rules case by case and may make exceptions to protect the overall view of the fair and neighbors’ visibility.
Hall columns inside your plot can carry a foam, board or canvas cover, but only without gluing or fixing it to the column, and only with prior approval from the Technical Secretariat. If your project hangs anything from the hall structure, you also file the rigging authorization form; see our rigging approval checklist.
Every stand, including free design, must include at least the dividing walls with the hall wall and adjacent stands, depending on location. That is easy to forget on an open, island-style concept. A neighbor’s back wall is not a substitute for your own.
Assembly fees (derechos de montaje) belong to the company doing the build, payable before work starts. The exhibitor can choose to pay them through Zona Expo instead. They can be booked with a 5% discount up to 30 days before build-up starts, and with a 25% surcharge in the last 7 days before build-up and during the event.
Because aluminium construction is excluded in these halls, a free-design stand here is, in practice, a carpentry-led project. That is work we do: custom wood carpentry design and build, with materials documented for approval. Our fire certificate and material register guide shows the paperwork to collect while the stand is still in the workshop.
How much does an Intergift 2027 stand cost?
Space for 16 to 99.5 m² at Intergift 2027 is listed at official organizer rates plus VAT, depending on open sides. On top come mandatory lines: the Conecta plan, two insurances, minimum electricity, and either the Premium turnkey stand or, for free design, assembly fees and your build. Confirm the current official exhibitor guide. Design and build starts from €120/m².
The guide prices space by area band and number of open aisles, with the per-m² rate falling in larger bands. All prices are before VAT; the guide explains the VAT treatment for Spanish, EU and other companies. Confirm the current official exhibitor guide.
The mandatory services are itemized in the official exhibitor guide: civil liability insurance, multi-fair insurance, minimum electricity consumption, and assembly fees that vary by build type (undecorated floor, basic modular, or design/carpentry). Confirm the current official figures. They are included in the organizer’s turnkey stand.
The Premium turnkey stand is listed as its own tariff line, with a different official rate under and over 50 m², plus VAT. Textile Editors pay a per-module official rate. Confirm in your offer how each line combines with the space rate, and check the current official exhibitor guide.
Hypothetical example, arithmetic from the guide’s listed rates. A 36 m² Deco stand with two open aisles: space 36 x €115.60 = €4,161.60; Premium stand line 36 x €72 = €2,592; minimum electricity 36 x €7.88 = €283.68; Conecta plan €450; insurances €144.83. Subtotal €7,632.11 plus VAT, before discounts and extra services. Check every line against your own offer.
Discounts and timing change the result. New exhibitors (none of the February 2025, September 2025 and February 2026 editions) get 15% off the floor-only rate; eligible returning exhibitors get 10%. Paying 100% of space by 30 October 2026 earned 5%. A service voucher worth 5% of the floor value, up to €1,000, applies to furniture, graphics, parking, paid internet and outdoor advertising, but not assembly fees.
For a first estimate before you talk to a builder, try our exhibition stand cost calculator, and test layout ideas for your square meters with the AI stand designer. Both give orientation, not an IFEMA quote.
For a free-design stand, the build is the largest line, and it is yours to scope. Use our exhibition stand cost guide to structure the quote, and our IFEMA Madrid costs and deadlines guide for venue-wide context. When you are ready, request a stand proposal with your plot plan attached.
Which dates control the build and the goods?
The Intergift 2027 calendar has five milestones a builder must work back from: free-design project by 28 December 2026, Premium personalization by 13 January 2027, the 25% late-order surcharge from 21 January, free-design build-up from 28 to 31 January, and goods and decoration entry on 1 and 2 February.
Payments come first. The guide set 30 October 2026 for the first 50% of space and 15 December 2026 for 100% of space and services. Without full payment, IFEMA will not authorize occupation of the space or hand over a modular stand. Put 15 December in the finance calendar now; it is the date that can stop an otherwise finished build.
Free-design build-up runs Thursday 28 January from 6:00 to 23:30, then 29 to 31 January from 8:30 to 22:30. Modular stands contracted with IFEMA are handed over on Monday 1 February from 8:30. Goods and decoration may enter on 1 and 2 February from 8:30 to 22:30, until midnight on the 2nd. From 19:00 on 2 February, only pedestrian gates are open while the recyclable aisle carpet goes down.
The end of the show has its own windows. Goods leave on Saturday 6 February from 19:30 to midnight and Sunday 7 February from 8:30 to 15:00. Between 19:30 and 20:30 on Saturday, only pedestrian doors are open. Stand dismantling runs Sunday 7 February from 15:00 to midnight, Monday 8 from 8:30 to 22:00 and Tuesday 9 from 8:30 to 15:00.
IFEMA staff will not receive goods for your stand. Address shipments to IFEMA MADRID, Feria Intergift, your company name, hall and stand number, and have your own people receive them at the stand during goods-entry days. Otherwise use the official handling partner named in the guide. Goods from outside the EU, including the United Kingdom, must clear customs; our shipping and customs guide covers the paperwork.
During build-up and dismantling, a helmet, high-visibility vest and safety shoes are mandatory in all exhibition areas. There are no specific builder passes. No assembly work may start until the occupational risk prevention and business-activity coordination protocol has been completed and sent to IFEMA. See our IFEMA contractor rules guide for that process.
What show-floor rules change the layout?
Five Intergift 2027 rules change what you design: direct sales are forbidden, products cannot sit outside your contracted perimeter, activities may not exceed 60 decibels, promotion happens only inside your space, and exhibitors may not install their own Wi-Fi access points. Each has a layout consequence worth planning before build-up.
No direct sales means no cash-and-carry counter. Design an order point instead: a counter with space for a tablet or price list, a sample wall and a quiet table for terms. Product placed outside your stand boundary will be invoiced as extra space, so displays must stay inside the line even when the aisle looks empty on day one.
The 60 dB limit covers any activity that could disturb other exhibitors. A video loop with sound or a live product demo needs a plan. Our guide to stand music and sound limits explains how to work with subtitles and directional audio. Free catering on the stand needs the IFEMA catering form, sent to the address in the guide.
The Wi-Fi ban protects the hall network from interference. The Conecta plan includes premium Wi-Fi for three users on the 5 GHz band. If your order app or digital catalogue needs more, contract it through the official shop rather than bringing a router. Test devices on 5 GHz before you travel.
Finally, staffing is a contractual rule. Exhibitors must attend the stand during all opening hours, and material may not be collected before the fair closes, especially on Saturday 6 February until 19:00. Breaking this can cost you preferential renewal of your space. Plan staff shifts and the pack-down so nobody is tempted to start early.
How do you plan passes, buyers and meetings?
Intergift 2027 gives one exhibitor pass per 5 m², with a minimum of 2 and a maximum of 50, plus Club Cards for your buyers that scale with stand size. The Conecta plan adds liveconnect tools for meetings, contacts and badge scanning. Size the stand’s meeting area to the buyers you can actually invite.
Club Cards give the holder and a companion direct access and one day of free parking. The allowance is 10 cards under 30 m², 20 from 30 to 50 m², 35 from 50.5 to 100 m² and 50 above 100 m². Textile Editors and interior-solutions exhibitors get 50. Every professional visitor with an invitation must still register as a professional.
That allowance is a useful design input. A 36 m² stand with 20 Club Cards and a few days of pre-booked meetings needs one good table, not three. A 120 m² stand with 50 premium buyers may need a separate meeting zone. Our trade show meeting capacity guide shows how to size tables from your appointment list.
Liveconnect lets three users search contacts, chat, book meetings at the stand, scan visitor badges and download the contact list. Set it up before 15 January, when the digital event opens. Exhibitors who need a visa can request a support letter from Zona Expo after personalizing their pass and keeping payments up to date; start at least 30 days before travel.
For product-heavy collections, plan sample flow as carefully as visitors. Daily restocking through service doors at the back of the halls is possible, with routes and times to be published. Our sample inventory guide keeps the storage room from becoming the place where orders get lost.
What should you confirm before you brief a builder?
Before you brief a builder for Intergift 2027, confirm your area and exact square meters, your stand type, the open sides, the payment status and every Zona Expo deadline. Then list products, storage needs, meeting count and power loads. A builder can only quote fairly when those facts are fixed in writing.
Working resource: Intergift 2027 decision sheet. Copy this table into your project file and add an owner and evidence for each line. It is an internal planning sheet built from the official guide, not an organizer form.
| Item | Rule / deadline (Intergift 2027 guide v7) |
|---|---|
| Contracted area (H&D / Deco / Gifts / Textile Editors) | From contract |
| Exact m² and open aisles | From contract and plot plan |
| Stand format | <50 m²: Premium turnkey (automatic). >50 m²: free design or Premium. Exception <50 m² only via Commercial Management |
| Aluminium framing in the concept? | Guide: aluminium construction not permitted in these halls. Get Technical Secretariat answer in writing |
| 100% of space and services paid | 15 Dec 2026 |
| Free-design project uploaded to Zona Expo | Before 28 Dec 2026 (+ rigging form if hanging) |
| Premium: wall color, carpet, 20-char fascia, plan | Target 28 Dec 2026; last changes 13 Jan 2027 |
| Assembly fees booked (free design) | ≥30 days before build-up for 5% off |
| All other services ordered | Before 21 Jan 2027 (then +25%) |
| Risk-prevention protocol (PRL/CAE) sent to IFEMA | Before any build work |
| Free-design build-up crew + PPE | 28 Jan 6:00–23:30; 29–31 Jan 8:30–22:30 |
| Goods receiver named at the stand | 1–2 Feb 8:30–22:30 (2 Feb to 24:00; pedestrian only from 19:00) |
| Non-EU / UK goods: customs agent details | Before shipping |
| Liveconnect users set up (3) | Before 15 Jan 2027 |
| Club Cards sent to buyers | 10 / 20 / 35 / 50 by stand size |
| Order point designed (no direct sales); product inside perimeter | Design review |
| Sound under 60 dB; no own Wi-Fi access points | Design review |
| Staff rota to 19:00 Sat 6 Feb; pack-down windows booked | 6 Feb 19:30–24:00; 7 Feb 8:30–15:00; dismantle 7–9 Feb |
A practical tip from the build side: put the 28 December project date into your plan as 18 December. Christmas and the 6 January holiday sit right around that deadline, and approvals rarely move faster in late December. This is our scheduling judgment, not an organizer rule.
Is there a video with stand decoration tips?
This short video from our Diseño Stands Ferias channel covers practical ideas for decorating a promotional stand. It is in Spanish and is general advice, not specific to Intergift.
What else do exhibitors ask about Intergift 2027?
When and where is Intergift 2027?
Intergift 2027 takes place at IFEMA MADRID from Wednesday 3 to Saturday 6 February 2027, from 10:00 to 19:00. Exhibitors can enter from 8:30 and must leave by 20:00. It is a professional-only fair, and the liveconnect digital event runs from 15 January to 15 March 2027.
Can I build my own stand under 50 m²?
Not by default. In Home & Design, Deco and Gifts, spaces under 50 m² are invoiced the Premium turnkey modular stand automatically. The Commercial Management may exceptionally authorize free design for a special, differentiated project submitted through Zona Expo. Request it early and in writing.
Is aluminium construction allowed at Intergift 2027?
The official guide says aluminium construction is not permitted in the Home & Design, Deco and Gifts halls. If your stand concept depends on an aluminium system, ask the Technical Secretariat in writing how this applies to your project before production starts.
When is the free-design project due?
Upload the free-design project to Zona Expo for approval before 28 December 2026. If it includes hanging structures, also file the rigging authorization request. Build-up for free-design stands runs from 28 to 31 January 2027.
What is the late-booking surcharge?
Services, including assembly fees, booked in the 7 days before build-up starts (from 21 January 2027) cost 25% more. Assembly fees booked up to 30 days before build-up get a 5% discount, and other services ordered through Zona Expo by then also get 5% off, with exclusions listed in the guide.
Can I sell products on the stand?
No. The guide strictly forbids direct sales of any items exhibited. Plan your stand as a showroom with an order point, and keep products, samples and promotional material inside your contracted space.
Can Adam Expo Stand help with an Intergift stand?
Yes. We design and build custom wood carpentry stands, modular stands with Aluvision and beMatrix where a venue allows them, and turnkey projects. Founded in 2017, Adam Expo Stand has delivered 639+ projects, and founder Adam Dragos has worked in exhibitions since 2004. Send us your plot plan to start.
Who wrote this Intergift 2027 guide?
Adam Dragos is the founder of Adam Expo Stand and has worked in exhibitions since 2004 on projects across Europe. Based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal. Read more about us.
What should you read next?
- Ambiente Frankfurt exhibition stand: 2027 planning guide
- Interihotel exhibition stand at IFEMA Madrid
- Custom vs modular exhibition stands in Spain
More from us on Medium, Substack and LinkedIn.
Ready to plan your Intergift 2027 stand?
Tell us your area, square meters and open sides, and we will tell you which format applies and what it takes to deliver it on time. Request a stand proposal.