Exhibition Stand Contractor at IFEMA Madrid: Rules, Paperwork, Costs and Timelines

Quick answer: You don’t need an IFEMA-homologated company to build your stand at IFEMA Madrid. Under IFEMA’s general participation rules, any exhibitor or builder can submit plans, at least one month before build-up. Stands are generally limited to 4 m, with exceptions, and double-deck stands need an inspection certificate and structural supervision. Design and build starts from approx. €280/m². The Adam Expo Stand cost calculator can help with a first estimate. Always check the show-specific rules for your event.

Infographic: IFEMA Madrid stand height rules (4 m, 6 m perimeter element, 1 m setback) and double-deck requirements compared with Fira Barcelona
Published IFEMA, FITUR 2027 and Fira Barcelona rules. Check the show-specific rules for your event.
Custom Booth Design and Build: Deprez at Fruit Attraction, IFEMA Madrid

Who can build your stand at IFEMA Madrid?

Any competent contractor can. IFEMA’s general participation rules let the exhibitor or its chosen builder submit the stand project. What matters is that the design follows the rules and the paperwork arrives on time.

That’s good news for international exhibitors. You can bring your own design agency, hire a local builder, or use a turnkey contractor that handles design, production, plan submission and installation in one contract. The rules below come from IFEMA’s general rules. Your show’s exhibitor manual can add to them or change them, so check the show-specific rules for your event.

IFEMA “homologación” explained (and why you don’t need it)

You’ll often see the word homologación (homologation) around IFEMA. It refers to IFEMA’s continuous homologation of suppliers for the design, build, maintenance and dismantling of free-design stands (file Exp. 20/074).

It is a procurement channel, not a licence to build. IFEMA sells free-design stands through its own service catalogue and splits those orders 50/50 between homologated suppliers and the winner of its framework agreement. To be homologated, a company must prove legal capacity, show that no contracting ban applies to it, and meet technical and financial solvency requirements (Annex I of the rules).

So, if you’re building your own stand or hiring your own contractor, the homologated list is not a requirement. It matters only if you order a free-design stand through IFEMA’s own catalogue.

IFEMA stand rules that shape your design

These come from IFEMA’s general participation rules (PDF). Design to them from day one. Redesigning after a rejected plan costs more than getting it right first.

Height limits

  • The general maximum height is 4 m.
  • One perimeter element can reach 6 m, provided it is not adjacent to a neighbouring stand.
  • With a 1 m setback from neighbours, all elements may go higher.
  • Some zones remain limited to 4 m, whatever the setback.

Double-deck stands

A two-storey stand needs an inspection certificate and a structural supervision declaration. Plan for this in your timeline and budget. It’s engineering work, not a form you fill in the week before.

Plan submission deadline

Under the general rules, plans go in one month before build-up. Shows can set their own dates, and they’re often earlier.

Walls, platforms and ceilings

Under the same general participation rules:

  • Every stand needs at least its party walls, 2.50 m high, against the hall wall and neighbouring stands.
  • A platform higher than 19 mm needs at least one access ramp, 1.00 m wide or more.
  • Rear faces get a neutral finish of similar quality to the inside of the stand, with no logos or lettering.
  • A ceiling cannot be fully closed unless it is fabric, micro-perforated or another material that lets smoke rise and sprinkler water fall; otherwise leave at least 10% of the covered area open.
  • No drilling, painting or glue on the hall floor or walls, and no spray painting inside the venue.

Show example: FITUR 2027

The FITUR 2027 exhibitor guide and specific rules (PDF) allows double-deck stands up to 7 m with a 1 m setback, and the free-design stand deadline is 13 December 2026. It’s a good example of why the show manual always comes before the general rules.

Power, cleaning and flooring

Who orders these, and what is billed separately, is set per show. Check your exhibitor manual.

IFEMA exhibitor deadlines: what is due and when

IFEMA’s general participation rules set the baseline below. Each show’s exhibitor guide sets the real dates and can move them earlier, so put both side by side.

  • One month before build-up: the free-design project (floor plan, elevations and a dimensioned perspective) goes to IFEMA through the Zona Expo for approval. Build-up cannot start without an approved project, and stands that break the rules get no power.
  • One month before build-up: last day to order services from IFEMA’s Services Catalogue. IFEMA may refuse later requests.
  • Seven days before build-up and later: any service IFEMA still accepts carries a 25% “last-minute services” surcharge. Cancelling a service in the 15 days before build-up costs 40% of its price.
  • One month before build-up: rigging projects are due, sent with the authorisation form to [email protected]. IFEMA answers within seven days (IFEMA rigging regulations).
  • 30 days before build-up: request access for forklifts and lifting platforms from [email protected]. IFEMA replies within seven days.
  • Before work starts: the stand builder pays IFEMA’s assembly rights (derechos de montaje), charged by stand type.

Build-up and dismantling at IFEMA

The build-up and dismantling days and working hours are the ones in each show’s specific rules. Outside them, no material goes in or out and no staff can stay in the venue without IFEMA’s express permission. Vehicles enter the halls only to unload and cannot park inside (general participation rules).

Plan the end as carefully as the start. Material still in the hall after the official deadlines is treated as waste and removed by IFEMA at the exhibitor’s cost: cleaning hours and containers are billed at ten times the catalogue price, plus the cost of dismantling any structure with a 20% surcharge.

Example, FITUR 2027 (January 20–24, 2027): free-design stands in halls 1–10 build on January 13, 14, 15 and 18 from 06:30 to 21:30 and on January 16–17 from 06:30 to 19:30; goods and decoration arrive on January 19. Dismantling runs on January 25–26 from 06:30 to 21:30 and on January 27 from 06:30 to 15:00 (FITUR 2027 exhibitor guide, section 6.1). The guide’s summary table prints a different dismantling range, so confirm with IFEMA before you book crews.

Comparing dates across the city? Our Madrid trade fair calendar 2027 lists IFEMA’s fairs, and our pages for FITUR stands, ARCOmadrid stands and Fruit Attraction stands cover show-specific planning. Exhibiting elsewhere in Iberia too? See our guides to Fira Barcelona Gran Via, FIL Lisbon and Exponor Porto.

What international exhibitors need to prepare

A contractor can only move as fast as your brief. Send these early:

  • Show name, hall and stand number, plus the floor plan showing open sides
  • Stand size in m² and the show’s exhibitor manual
  • Brand guidelines, logos and graphic files
  • AV and power needs (screens, demos, lighting)
  • Meeting room, storage and hospitality requirements
  • Budget range and commercial objective (leads, launches, meetings)

Also check your show’s exhibitor manual for service order deadlines and plan submission dates.

What a stand at IFEMA costs (estimates)

The Adam Expo Stand exhibition stand cost calculator gives these estimates. They aren’t quotes: scope, height and services change the final price, and space and show services are paid separately.

ItemDesign and build
Modular standapprox. €280–380/m²
Custom-built standapprox. €450–650/m²
Double-deck standapprox. €750–1,100/m²
AV packageQuoted per project
Meeting roomQuoted per project
StorageQuoted per project
Events in the rest of EuropeQuoted per project

The calculator’s default example comes to €16,200–23,400. Not sure whether modular or custom fits your show? Read our guide to modular vs custom exhibition stands at IFEMA Madrid.

Madrid vs Barcelona: IFEMA vs Fira Barcelona rules for exhibitors

Exhibiting in both cities? Don’t assume one design will pass at both venues. Here is how the published rules compare. Fira Barcelona data comes from its Technical Regulations (PDF). Check the show-specific rules for your event at either venue.

CriterionIFEMA MadridFira Barcelona
Who can buildAny exhibitor or builder submits plans; homologation not requiredPlans go to Operations in advance; contractor passes are issued per show via the event’s Contractor Area (e.g. Automobile Barcelona contractor area)
General height4 m; one 6 m perimeter element; higher with a 1 m setback; some zones 4 m5 m; taller counts as a complex structure; some zones 4 m
Double-deckInspection certificate + structural supervision declarationComplex structure: technician-stamped project, supervised build-up, final certificate; upper floor ≤50% of stand area at Fira events
Plans and approvalOne month before build-up (FITUR 2027 free design: 13 Dec 2026)In advance, per show, via [email protected]; no build-up until approved
Services and riggingOrdered per show (see manual)Services via Servifira and BuildUp Fira; rigging only through Fira’s official supplier
AlwaysCheck show-specific rulesCheck show-specific rules

In practice: a 6 m feature wall that passes in Madrid may need a stamped engineering project in Barcelona, and a double-deck sized for IFEMA may break Fira’s 50% upper-floor rule. Decide early which venue sets the tightest limit, and design to it.

How to choose a stand contractor for IFEMA

Skip the rankings. Ask these questions instead:

  • Do they handle the paperwork? Plan submission, double-deck certification and structural supervision should be in the quote.
  • Do they design, build and install under one contract? One contract and one project manager means fewer gaps at build-up.
  • Have they built at IFEMA? Ask for photos of real stands, not renders only.
  • Is the quote itemised? Structure, graphics, AV, furniture, transport and services should be listed separately.
  • Are they insured for build-up and dismantling at the venue?

We work in custom wood carpentry design and build, modular stands with Aluvision and beMatrix systems, and turnkey projects. If you need a contractor in Madrid, see our exhibition stand builder service at IFEMA Madrid and our exhibition stand builder in Madrid, Spain page. For a wider view of the market, there’s also our overview of exhibition stand builders in Europe.

Frequently asked questions

Do I need to be IFEMA-homologated to build my stand?

No. Homologation is the channel IFEMA uses to sell free-design stands from its own service catalogue. Under IFEMA’s general participation rules, any exhibitor or builder can submit stand plans.

How high can my stand be at IFEMA Madrid?

Generally 4 m. One perimeter element can reach 6 m if it is not next to a neighbouring stand, and with a 1 m setback from neighbours all elements may go higher. Some zones stay at 4 m, so check the show-specific rules for your event.

What do I need for a double-deck stand at IFEMA?

An inspection certificate and a structural supervision declaration, with plans submitted one month before build-up. Some shows set their own limits: FITUR 2027, for example, allows double-deck stands up to 7 m with a 1 m setback.

When must stand plans be submitted to IFEMA?

At least one month before build-up under the general rules, unless your show sets its own date. For FITUR 2027, the free-design deadline is 13 December 2026.

How do Fira Barcelona’s stand rules differ?

The general maximum height is 5 m. Anything taller is a complex structure that needs a technician-stamped project, supervised build-up and a final certificate. At Fira events, the upper floor of a double-deck may cover at most 50% of the stand area, and rigging goes only through Fira’s official supplier.

Can a foreign company manage an IFEMA stand remotely?

Yes. You don’t need to be in Madrid: your stand contractor prepares and submits the plans and runs build-up, while you approve the design remotely. Check the show’s exhibitor manual for the deadlines that apply to you.

Planning a stand at IFEMA Madrid?

Send us your show, stand number and size. We’ll prepare the design, handle the plan submission and send an itemised quote. Request a 3D design consultation via our contact page, or start with the cost calculator.