By Adam Dragos · Last updated: November 2026
An exhibition stand at FITUR 2027 means designing and building a tourism stand at IFEMA Madrid for the International Tourism Trade Fair from 20 to 24 January 2027. Trade days run Wednesday to Friday; Saturday and Sunday open to the public. The organizer sells space-only plots at official rates plus VAT, optional SOLID or LIGHT turnkey packages, and a mandatory CONECTA Exhibitor Plan. Confirm the current official Exhibitor’s Guide.

This guide is for tourism boards, hotels, OTAs, DMCs, travel-tech suppliers and destination brands that have booked, or are weighing, a stand at FITUR 2027. Everything below comes from IFEMA MADRID’s official FITUR 2027 Exhibitor’s Guide and Specific Rules of Participation, the FITUR launch news for 2027 and the public FITUR site, all linked in the sections that use them. Where a detail is not clear in those sources, we mark it and tell you what to ask in Expo Zone.
We write this from the builder’s side. Adam Expo Stand designs and builds custom wood carpentry, modular stands with Aluvision and beMatrix, and turnkey projects. Based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal. Across 639+ projects we see the same pattern at FITUR: the exhibitors who treat the official price list and the 13 December project upload as their project plan finish quieter builds than those who treat IFEMA as a generic venue.
Key takeaways
- FITUR 2027 (47th edition) runs 20–24 January 2027 at IFEMA MADRID, with Puerto Rico as Partner Country (>FITUR 2027 launch).
- Trade visitors only on 20–22 January (10:00–19:00). Trade and general public on 23 January (10:00–20:00) and 24 January (10:00–18:00). Hall 12 (Knowledge Hub) is open 20–22 January only (>Exhibitor’s Guide).
- Space-only, SOLID and LIGHT turnkey packages, double-deck and outdoor space are all charged at official organizer rates plus VAT. Confirm the current official Exhibitor’s Guide.
- Every exhibitor must contract the CONECTA Exhibitor Plan at €736 + VAT.
- Space-only also carries mandatory liability insurance (€74.30 + VAT), multi-fair insurance (€70.53 + VAT), minimum electricity 0.13 kW/m² (€7.88 + VAT) and assembly rights (Type A/B/C).
- Free-design projects must be uploaded to Expo Zone for approval before 13 December 2026. The same date covers modular lettering, carpet color and rigging applications.
- First 50% of contracted space is due by 14 September 2026; 100% by 30 November 2026.
- Aisle-facing blind walls cannot exceed 50% of each side. Longer walls must sit at least 3 m back and cannot cover more than 80% of that façade length.
- Assembly for halls 1–10 runs 13–18 January 2027 (hours vary by day). Dismantling runs 25–27 January 2027.
What is FITUR and who walks the aisles?
FITUR is IFEMA MADRID’s International Tourism Trade Fair, a global B2B hub for destinations, hotels, operators and travel technology that opens to the public on the weekend. The 2027 edition is the 47th and expands into two more halls than the previous edition, for a total of eleven halls arranged by world regions plus a Travel Technology area (>launch news).
Specialised sections listed for 2027 include FITUR 4ALL (accessible tourism), FITUR Cruises, FITUR Experience, FITUR LGTB+, FITUR Lingua, FITUR Know-How & Export, FITUR Screen, FITUR Sports, FITUR Talent, FITUR TechY, FITUR Woman and the FITURNEXT Sustainability Observatory. That mix matters for stand design: a destination pavilion, a hotel brand and a booking-tech demo do not need the same frontage, meeting depth or AV load.
For the January 2026 edition, IFEMA reports 255,000 visitors, more than 10,000 companies from 161 countries (111 officially represented) and a €505 million impact on Madrid’s economy. Those are organizer figures from the launch release, not an independent audit. Use them as scale context, not as a guarantee of footfall on your aisle.
Access rules shape the brief. The first three days are trade-only, with access controls to keep the floor professional. The weekend opens to end travellers. Your stand therefore works two jobs: closed-door meetings and deal flow midweek, then a clearer public story on Saturday and Sunday without rebuilding overnight.
When is FITUR 2027, and when do you build?
FITUR 2027 opens Wednesday 20 January and closes Sunday 24 January 2027 at IFEMA MADRID. Build for halls 1–10 starts 13 January; modular packages are handed over on 19 January from 08:30; dismantling for those halls runs 25–27 January.
Official opening hours from the Exhibitor’s Guide:
| Day | Audience | Hours |
|---|---|---|
| Wed 20 – Fri 22 Jan | Trade visitors only | 10:00–19:00 |
| Sat 23 Jan | Trade + general public | 10:00–20:00 |
| Sun 24 Jan | Trade + general public | 10:00–18:00 |
| Hall 12 Knowledge Hub | 20–22 Jan only | 10:00–19:00 |
Exhibitors may enter from 08:00 and leave one hour after closing. Goods entry for decoration and merchandise is scheduled for 19 January 06:30–21:30; from 19:00 that day, goods entrances close so IFEMA can lay recyclable aisle carpet, and only pedestrian access continues.
Assembly window (free-design), halls 1–10:
- 13, 14, 15 and 18 January: 06:30–21:30
- 16 and 17 January: 06:30–19:30
Hall 12 assembly: 16–17 January 06:30–19:30 and 18 January 06:30–21:30.
Dismantling, halls 1–10: 25–26 January 06:30–21:30 and 27 January 06:30–15:00. Hall 12 dismantles earlier (23–24 January). Outgoing merchandise for the main halls is allowed on 24 January from 18:30 to midnight, with a short pedestrian-only window from 18:00 for aisle carpet removal.
A working timeline that fits those dates (our recommendation, not an IFEMA rule):
- Now to space confirmation: lock size, open sides and hall preference; decide space-only vs SOLID/LIGHT.
- Through summer 2026: concept, budget and AV/meeting brief. Returning 2026 exhibitors had a priority reservation deadline of 5 June 2026.
- By 14 September 2026: pay the first 50% of contracted space.
- By 30 November 2026: pay 100% of space and contracted services.
- By 13 December 2026: upload the free-design project (and rigging request if needed); set modular lettering and carpet color.
- By 15 December 2026: book services to keep the 5% Expo Zone discount.
- 13–19 January 2027: assemble, dress graphics, test demos, rehearse the trade-day meeting script.
- 20–24 January: trade first, public weekend second.
- 25–27 January: dismantle on schedule and clear waste.
From our builds at IFEMA, the mistake we see most is treating 13 December as a graphics deadline. It is a project-approval deadline. Late uploads push changes into the assembly week, when crew time is already bought.
How much does space at FITUR 2027 cost?
Space-only at FITUR 2027 is charged by the organizer at the official space rate plus VAT. That figure is floor space only — confirm the current official Exhibitor’s Guide. Turnkey packages, the CONECTA plan, insurance, minimum power and assembly rights sit on top for free-design stands. Build, graphics, furniture, AV and logistics are separate.
Published 2027 rates from the Exhibitor’s Guide:
| Concept | Official rate |
|---|---|
| Space only | See the official Exhibitor’s Guide |
| SOLID turnkey (16 m²) | See the official Exhibitor’s Guide |
| Additional SOLID m² | See the official Exhibitor’s Guide |
| LIGHT turnkey (16 m²) | See the official Exhibitor’s Guide |
| Additional LIGHT m² | See the official Exhibitor’s Guide |
| Double deck | See the official Exhibitor’s Guide |
| Outdoor space | See the official Exhibitor’s Guide |
| CONECTA Exhibitor Plan (mandatory) | See the official Exhibitor’s Guide |
| Co-exhibitor registration | See the official Exhibitor’s Guide |
| Liability insurance | See the official Exhibitor’s Guide |
| Multi-fair insurance | See the official Exhibitor’s Guide |
| Minimum electricity | See the official Exhibitor’s Guide |
| Assembly rights Type A / B / C | See the official Exhibitor’s Guide |
For companies based in Spain (excluding the Canary Islands, Ceuta and Melilla), 10% VAT applies. For other companies the guide explains when the operation is not subject to Spanish VAT and when EU exhibitors account for VAT in their own country. Confirm your case with IFEMA customer service before you lock the budget.
Worked example: a 36 m² space-only stand. The organizer bills floor space, the mandatory CONECTA plan, insurance, minimum electricity and assembly rights, all plus VAT — confirm the current official Exhibitor’s Guide. Your custom stand build, graphics, AV, transport and crew are not in that organizer total. Design and build starts from €120/m². See our exhibition stand cost guide for Europe and the IFEMA Madrid costs and deadlines guide for how we itemize the builder side.
Space reservation fees (paid with the application, by contracted area): €450 + VAT (16–50 m²), €750 + VAT (50.5–100 m²), €1,500 + VAT (from 100.5 m²).
Hidden cost lines that still surprise tourism exhibitors:
- Extra power above the 0.13 kW/m² minimum for LED walls, demo stations or coffee service
- Rigging approval and hanging-structure fees
- Daily cleaning upgrades beyond the package default
- Co-exhibitor fees when regions share a pavilion
- 25% surcharge on assembly rights and services booked from 6 January 2027
- Waste containers and late-removal charges if materials stay after the dismantling deadline
- Customs clearance for non-EU goods (the UK is treated as a third country since 2020)
What rules change a free-design stand at FITUR?
Free-design (space-only) exhibitors must build separating walls against the hall wall and adjoining stands, keep aisle façades mostly open, upload the project before 13 December 2026, pay assembly rights before work starts, and follow IFEMA labour-risk and waste rules.
Rules that change the drawing (from the free-design section of the guide; we omit height limits per our house editorial policy and tell clients to read those lines in the PDF themselves):
- Blind perimeter walls cannot make up more than 50% of each side facing an aisle.
- Longer walls must be set back at least 3 m from the perimeter and cannot make up more than 80% of that façade length.
- Building elements and spotlights may not protrude more than 50 cm beyond the allotted space (from the minimum height stated in the guide).
- Double-deck stands need a certificate or project signed by a competent technician and endorsed by the relevant professional association, with dimensions, service load and capacity stated. Second floors are not permitted in hall connecting nuclei or on the entrance sides of Halls 9 and 10.
- IFEMA lays recyclable carpet in aisle strips. The uncarpeted edge strip belongs to the aisle; do not cover it, or IFEMA can invoice the invaded area as extra space.
- Helmet, high-visibility vest and safety footwear are compulsory during assembly and dismantling. No assembler passes are issued.
- No assembly starts without the labour-risk and business-activity coordination protocol filed with IFEMA.
- If the project includes hanging structures, file the rigging application in Expo Zone before 13 December 2026.
Assembly rights pricing reflects how heavy the build is: Type A undecorated floor, Type B solid modular aluminium-type, and Type C aluminium with carpentry and other materials. Confirm the current official Exhibitor’s Guide. Turnkey SOLID and LIGHT packages include assembly rights in the package price.
For the wider IFEMA paperwork path (homologation vs permission to build, plan submissions, remote management), read our exhibition stand contractor rules for IFEMA Madrid. For power sizing beyond the FITUR minimum, use the exhibition stand power plan. For hanging signs, see the rigging approval checklist.
SOLID, LIGHT or free-design: which fits a tourism brief?
SOLID and LIGHT are IFEMA turnkey packages from 16 m² with structure, storage, carpet, lettering, lighting and included assembly rights and insurance. Free-design space-only is for brands that need custom carpentry, a distinctive destination story or a layout the package cannot deliver.
SOLID (from the guide) uses a grey aluminium structure and melamine panels, lockable storage sized by area, choice of five carpet colors (default Jasper Grey), standard lettering (max 20 characters), LED spotlights on rails (one per 3 m²) and an electrical panel sized for 130 W/m². Furniture is not included. Carpet color and lettering must be set in Expo Zone by 13 December 2026. Finished SOLID/LIGHT stands are delivered from 08:30 on 19 January.
LIGHT is the higher package price with denser lighting (the guide lists LED spotlights on a different density) and its own storage and carpet rules. Both packages still require the CONECTA plan. Interior decoration that adds panels, totems, platforms or trusses must still be uploaded as a project before 13 December.
When we recommend free-design instead: large destination pavilions, multi-brand regions, meeting-heavy OTAs, or travel-tech demos that need controlled sightlines. Custom wood carpentry gives the strongest brand identity for a Partner Country or regional pavilion. Modular Aluvision or beMatrix systems help when the same kit must resize for a later European show. Turnkey from a single contractor covers design, build, graphics, AV coordination and dismantling under one schedule. Compare approaches in our custom vs modular guide for Spain.
Payments, withdrawals and the dates that stop a build
Returning FITUR 2026 exhibitors had a priority renewal window tied to paying the reservation fee by 5 June 2026. All exhibitors face 14 September (50%) and 30 November (100%) payment deadlines for contracted space and services.
If you book after 14 September, the guide requires 50% with the reservation. Withdrawal must be written to event management. You lose the amounts that were due by the notice date under the payment schedule. If you withdraw within 30 days of opening, IFEMA may demand full payment for the hired space. Additional services follow the cancellation charges in IFEMA’s general conditions.
You cannot occupy the stand, and modular stands are not delivered, until space fees and requested services are paid in full. That single line is why we put payment dates on the same Gantt chart as graphics and trucking.
Badges, invitations and visas
Exhibitor badges and invitations scale with contracted area and are managed in Expo Zone under Event Access. Examples from the guide: up to 24.5 m² receives 7 exhibitor badges; 25–49.5 m² receives 15. Extra one-day badges cost €21.60 + VAT; permanent extras €32.50 + VAT. Passes are personalised with name, company and country; identity checks may run at the gates.
Trade and public weekend invitations also scale with area (for example, up to 24.5 m²: 15 one-day trade, 10 permanent trade, 25 public weekend invitations). Recipients redeem codes online; codes cannot be redeemed at the reception desk. Visa support letters for exhibitors are requested in Expo Zone after passes are personalised and payments follow the schedule. Application deadline for the visa support letter: 15 January 2027.
Design the stand for trade days, then for the public weekend
The same footprint has to win private meetings on Wednesday and remain clear when families and leisure travellers arrive on Saturday. That is a zoning problem, not a decoration problem.
A practical three-zone layout we use for tourism clients (hypothetical example, labelled as such):
- Open front / destination story, one hero message, large photography or map, QR to the meeting booker. Keep the first two metres readable from the aisle for public days.
- Meeting core, semi-closed tables for operators and buyers during trade hours. Size seating with our trade show meeting capacity logic, not with lounge furniture alone.
- Back of house, brochure stock, giveaways, coats, charging. Storage room sizes in the SOLID package scale with m²; free-design storage should match a full trade day plus weekend restock.
Travel-tech exhibitors should put one live demo in the open zone and keep the deep product walkthrough in the meeting core. Destinations should decide whether the Partner Country or regional story owns the front, or whether commercial partners share equal façades under the 50% openness rule.
After the show, run a 14-day follow-up. The CONECTA digital tools and badge scans only matter if someone owns the CRM steps. Our trade show lead follow-up plan is the process template we give clients.
First-person verdict
From our projects at IFEMA Madrid, FITUR rewards exhibitors who budget the organizer lines early and protect aisle visibility. The space-only headline rate is only the floor, not the stand. CONECTA, insurance, minimum power and assembly rights are compulsory add-ons for free-design. The 13 December upload is the critical path. If your destination story needs custom carpentry, start the brief now so approval, production and the 13–18 January assembly window line up without overnight miracles.
Checklist before you brief a builder
- Confirm hall, open sides and whether you need Hall 12 Knowledge Hub adjacency
- Choose space-only, SOLID or LIGHT with a written reason
- Build a spreadsheet: space + CONECTA + insurance + min power + assembly rights + builder quote
- Diary 14 September, 30 November, 13 December, 15 December, 6 January surcharge
- Draw the 50% aisle-façade rule on every open side before you place storage
- Decide trade-day meeting capacity vs weekend public flow
- Assign who uploads the project to Expo Zone and who pays assembly rights
- Plan waste removal inside the dismantling window
FAQ
When is FITUR 2027 and is it trade-only?
FITUR 2027 runs 20–24 January 2027 at IFEMA MADRID. Wednesday 20 to Friday 22 are for trade visitors only. Saturday 23 and Sunday 24 are open to trade visitors and the general public. Hall 12 (Knowledge Hub) operates only on the three trade days.
How much is space-only at FITUR 2027?
Space-only is charged at the official rate plus VAT according to the official Exhibitor’s Guide. Add the mandatory CONECTA Exhibitor Plan, and for free-design stands also insurance, minimum electricity and assembly rights. Build costs are separate; design and build starts from €120/m².
What is the CONECTA Exhibitor Plan?
CONECTA is a mandatory €736 + VAT package. It covers exhibitor-list presence, the digital platform, up to 60 products or services on the company file, hall plans, Expo Zone access, exhibitor passes and online invitations per contract, and related networking tools described in the guide.
What is the most important design deadline?
Upload free-design projects to Expo Zone before 13 December 2026. The same date covers modular lettering, carpet color choices and hanging-structure applications. Services booked by 15 December keep a 5% discount; from 6 January 2027 a 25% surcharge applies.
Can we build a double-deck stand?
Double-deck floor area is priced at the official organizer rate plus VAT. The guide requires a technician-signed certificate or project endorsed by the professional association, with load and capacity stated. Second floors are barred in connecting nuclei and on the entrance sides of Halls 9 and 10. Read the full structural rules in the PDF; we do not restate height figures here.
Who is the Partner Country for FITUR 2027?
Puerto Rico is the Partner Country for FITUR 2027, according to IFEMA’s March 2026 launch announcement and the FITUR homepage. If another page on the site still names a different guest country, treat that page as outdated until IFEMA updates it.
About the author
Adam Dragos is Exhibitor Success Specialist at Adam Expo Stand, an Award Winning and Eco-friendly exhibition stand design and build company founded in 2017. He has worked in exhibitions since 2004 on projects across Europe. Adam Expo Stand has delivered 639+ projects. Based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal. Capabilities: custom wood carpentry, modular systems (Aluvision and beMatrix) and turnkey delivery.
Discuss your stand brief: contact us · +34 697 715 015 · [email protected]
Also publish longer notes on our Medium, Substack and LinkedIn company page.