Planning a SMARTDOORS 2026 exhibition booth? IFEMA MADRID lists the event for November 10–13, 2026. Start your brief with the product you need to demonstrate: a moving door, an automatic gate, a reader or an access-control system. The booth layout, structure, power and installation plan must support that demonstration. Request an itemized quote against your allocated floor plan; a generic price per square meter cannot establish the cost of your project.

SMARTDOORS brings together doors and automation within International Construction Week, alongside CONSTRUTEC, VETECO and PISCIMAD. See IFEMA’s official event overview for the current scope. This guide explains how to prepare a design and build brief for a door or access-control brand. It is Adam Expo Stand’s planning advice, rather than an official exhibitor manual.

ALPHACAN stand with window profile displays at VETECO, IFEMA Madrid
Portfolio example: ALPHACAN at VETECO, IFEMA Madrid. This is a completed VETECO project, not a SMARTDOORS 2026 booth.

How should a SMARTDOORS booth demonstrate doors and access control?

Design around the product’s operating space, its support requirements and the visitor’s viewing position. A door that opens into a crowded aisle is a different design problem from a tabletop access reader. Establish the complete demonstration sequence before deciding where counters, graphics and meeting seats belong.

  • Moving doors and gates: provide dimensions, weight, movement envelope, fixing points and the manufacturer’s operating instructions. Identify where a trained demonstrator will stand and how visitors will remain outside moving parts.
  • Access readers and controllers: specify mounting height, cabling, power, network requirements and the demonstration credentials. Prepare an offline demonstration option if the product can support one.
  • Technical samples: explain whether visitors need to touch, compare or inspect the product. Label the differences they should notice, such as installation method, compatibility or supported use case.
  • Meetings: keep the discussion area separate from the product’s movement and service access. Allow staff to reach controls without moving furniture or obstructing visitors.

The appropriate booth size depends on these requirements and the allocated plot. Check the scaled layout with your product technician and booth designer. A fixed minimum size would be misleading without knowing the actual equipment.

Custom booth, reusable modular system or organizer package?

Compare what each format can accommodate. Turnkey describes the agreed service scope; it does not identify a construction system. Both custom and modular booths can be supplied with an agreed package of design, production, installation and dismantling.

Booth format decisions for product demonstrations
Option Useful when Check before choosing
Custom construction The product needs a specific frame, display arrangement or brand environment. Structural support, maintenance access, reusable components and installation scope.
Reusable modular system The same demonstration needs to travel to several events. Compatibility with the product load, different floor plans, storage, transport and reinstallation.
Organizer booth package with additions An available package meets most of the display needs. Permitted alterations, included services and a suitable independent support for heavy equipment.

Do not assume that a standard wall panel can hold a full door assembly. Obtain approval for the proposed mounting method before production. For a wider comparison, see our modular stand options and exhibition stand design services.

How much will a SMARTDOORS booth cost?

The cost requires a project-specific quote. Specify the allocated space, open sides, product dimensions and weights, demonstration requirements, graphics, furniture, service scope and reuse plans. Compare the same requirements across proposals.

Keep organizer charges and the booth contractor’s work visible as separate budget items. Ask which services are already included in your participation package before budgeting them again. Confirm taxes, transport assumptions and responsibility for each purchase in the written quote.

  • Design and construction: drawings, structural supports, display fixtures, graphics and finishing.
  • Product integration: mounting, specialist labor, power connections, controls, testing and access for servicing.
  • Logistics: delivery, handling, unloading, storage, return transport and packaging.
  • Event services: the services required for your actual installation, including any relevant electricity, internet, cleaning or suspended elements.
  • Installation and dismantling: crew, supervision, handover, removal and the agreed treatment of reusable components.

Ask for exclusions and change costs as well as inclusions. Our European exhibition budget guide explains how to organize a budget. It is not an IFEMA tariff or a quote for SMARTDOORS.

Which deadlines should exhibitors check now?

Check your project’s status in the exhibitor portal before committing to production. The 2026 exhibitor guide lists October 1, 2026 for free-design project approval submissions. That date has passed as of this update: if approval is incomplete, contact IFEMA through your exhibitor account to confirm the available next steps.

For modular alterations, the same guide contains different dates in its instructions. Get the applicable deadline confirmed for your specific package rather than relying on a generic countdown. Confirm the current rules and service terms before ordering.

  1. Confirm the allocated plot: floor plan, open sides, neighboring booths and service locations.
  2. Freeze demonstration requirements: equipment data, mounting method, power and operating sequence.
  3. Confirm approval: drawings, required documents and who uploads them.
  4. Release production: signed design, graphics and a written list of included items.
  5. Plan delivery and installation: access slots, handling, crew responsibilities and product technician availability.
  6. Test before handover: demonstrate the complete system and record any outstanding work.

Your contractor should provide a schedule based on the confirmed requirements and remaining time. Production time cannot be promised from booth area alone. Review our booth setup guide for the checks to include.

Who is responsible for the booth and the working product?

Agree one written responsibility list across the exhibitor, booth contractor, product technician and relevant venue service providers. A coordinated team needs clear ownership, whether it uses employees or specialist partners.

  • Exhibitor: product information, participation decisions, approved branding and visitor objectives.
  • Booth contractor: the agreed design, fabrication, installation, coordination and handover scope.
  • Product technician: product installation requirements, commissioning and operating instructions.
  • Organizer and venue: the applicable approval process, access arrangements and event services.

Ask who will be present for installation, who can authorize changes and how an issue is escalated during the event. Do not treat a booth quotation as a promise that the contractor will commission every mechanical or electronic product.

How can the layout support useful visitor conversations?

Use one clear message visible from the aisle, followed by a short demonstration that answers a buyer’s question. For example: how the reader integrates with an existing system, how the door is installed, or how a maintenance team reaches a component.

Prepare Spanish and English product labels where useful for your audience. Make technical documentation easy to find with a short URL or QR code, and provide a readable printed alternative. Keep specifications and performance claims consistent with your product documentation.

For each interested visitor, record the application, project stage, installation environment and agreed next step using your approved lead process. Measure qualified conversations and follow-up outcomes against your objectives. A working demonstration can help explain a product; it does not guarantee a sales or ROI increase.

What should you send to a SMARTDOORS stand builder?

Send the event name, allocated floor plan, booth dimensions, open sides, budget scope, deadline status and contact responsible for approvals. Include equipment drawings, weights, power and connectivity requirements, branding files, the intended demonstration and your future event schedule.

For organizers or group coordinators: add the number of exhibitors, a shared design standard, individual brand requirements, common service responsibilities and the process for approving changes. Clarify who orders event services and who accepts each booth at handover.

Adam Expo Stand provides exhibition stand design and build services. Discuss your SMARTDOORS project with the team and request a proposal stating scope, availability, responsibilities and exclusions.

SMARTDOORS booth planning: frequently asked questions

When is SMARTDOORS 2026?

IFEMA’s event overview lists November 10–13, 2026 in Madrid. Recheck the organizer’s current information and your exhibitor account before finalizing travel and installation arrangements.

Can an access-control brand use a live demonstration?

Plan the demonstration with your product technician and booth designer. Confirm mounting, power, connectivity, visitor access and applicable event approval requirements before production.

Is there a reliable standard booth price per square meter?

A generic price cannot cover the equipment support, installation and event services of every project. Request an itemized quote against a defined brief and compare equivalent scope.

What if my free-design approval has not been submitted?

Check with IFEMA through your exhibitor account now. The published guide’s October 1 submission date has passed; confirm the next steps directly instead of assuming late approval.

Can I reuse the booth after SMARTDOORS?

Potentially. Specify reuse before design and confirm which structures, fixtures and graphics can be stored, transported and adapted to future floor plans. Both modular and custom projects can include reusable components.

What should a turnkey proposal include?

It should identify each agreed service, the responsible supplier, handover criteria and exclusions. Check product commissioning, venue services, transport, storage and dismantling explicitly.

Official information checked October 2, 2026. Organizer instructions can change. See the event overview and the 2026 exhibitor guide. This page does not claim affiliation with IFEMA or approval as an official supplier.