FITUR Madrid Exhibition Stand: 2027 Planning Guide

Quick answer: Plan your FITUR Madrid exhibition stand around professional meetings, destination presentation and any public-facing activities. Confirm the plot, edition manual, services, documents, team and complete costs before production.

FITUR 2026 has finished: it took place on 21–25 January 2026, as recorded in its official exhibitor guide. The next announced edition is FITUR 2027 on 20–24 January. This guide retains its existing URL and distinguishes the editions to avoid planning around past dates.

FITUR 2027: professional and public days

IFEMA’s announcement confirms professional days on 20–22 January and public opening on 23–24 January. Recheck current hours and activities before scheduling meetings.

Prepare for the uses you will actually serve each day. A commercial programme may need tables and supporting documents; public presentations may need a short explanation, travel information and queue management. Match staffing and materials to each activity.

Briefing for a destination or tourism business

  • Offer: destinations, services, seasons and markets to represent.
  • Audience: priority buyers, distributors, media, partners or consumers.
  • Participants: co-exhibiting organisations and each team’s responsibilities.
  • Activities: meetings, presentations, demonstrations and walk-in enquiries.
  • Content: languages, authorised images, current information and final files.
  • Operation: staff, storage, seating, accessibility and schedule.

A destination group needs a shared message and a clear way to find each participant. Have the responsible organisations approve names, maps and facts before printing.

Layout: meetings and presentations without interference

Simulate a meeting while visitors arrive and a presentation runs. Check entry, circulation, noise, visibility and storage. There is no universal location for a meeting room or layout that guarantees more sales.

For screens and interactive experiences, define their information, operator and fallback. Size the installation for its activity and visitor service. A large audiovisual installation is not mandatory for destination presentation.

IFEMA documents and requirements

Review IFEMA’s participation regulations and FITUR’s documents for the contracted year. Confirm plot conditions, heights, loads, materials, installations and approvals with the technical owners.

Also check accreditation and access procedures. Do not treat a supposed universal list of officially recommended contractors as a contracting requirement or endorsement of Adam Expo Stand. Request the documents and responsibilities needed for the actual project.

Budget, services and programme

Separate space and participation, design and production, graphics, furniture, equipment, services, logistics, installation, removal and work by participating organisations. Request an itemised quotation with inclusions, exclusions and change conditions.

Work backwards from official submission, ordering and installation dates. Agree drawings, content and owners in time. A generic four-to-eight-month recommendation does not replace actual deadlines or supplier availability.

Meetings and follow-up

Check the organiser’s current contact and scheduling tools and access conditions. Offer relevant meetings and assign people who can attend. There is no universal percentage of pre-booked appointments that ensures better results.

Record questions, markets of interest, agreed actions, owners and dates through the approved process. Separate conversations, proposals and attributable business when assessing the programme. FITUR’s total attendance does not measure an individual stand’s return.

Share your FITUR brief with Adam Expo Stand to discuss scope, team, partners, budget and availability.

Similar Posts