FIL (Feira Internacional de Lisboa) in Parque das Nações has four exhibition pavilions of 10,000 m² each, with a 15 m ceiling in Pavilion 1, 12 m in Pavilions 2 to 4 and a floor load of 2,000 kg/m². FIL’s General Regulation sets a general stand height of up to 3 m: anything taller, and any second floor, needs FIL’s technical approval, with drawings submitted at least 20 days before build-up.
Last updated: 24 Nov 2026
This is a reference sheet, not a sales page. Every figure comes from FIL’s own websites (fil.pt and the venue site fil.lisbonvenues.pt) or from FIL’s General Regulation, and the source is linked next to it. Where FIL publishes no venue-wide figure, we leave the item out instead of estimating. This is our own independent summary, not a FIL publication. FIL’s documents and your event’s participation rules always prevail.
Which documents apply?
The base document is the FIL General Regulation (Regulamento Geral da FIL, PDF, Portuguese), also shown as “Condições Gerais” on FIL’s regulation page. FIL publishes it in Portuguese only; the article numbers below (for example “RG 7.2”) refer to that PDF. Each fair adds its own “Normas de Participação” (participation rules), which take precedence over the General Regulation for that event (RG 1.2). Dates, duration and opening hours are set for each event in a separate FIL document (RG 1.3).
The “Regulamento Específico” on the same FIL page applies to events at the Centro de Congressos de Lisboa (CCL), not to the FIL pavilions, so this sheet does not use it.
FIL at a glance
| Item | Official figure | Source |
|---|---|---|
| Address | Rua do Bojador, Parque das Nações, 1998-010 Lisboa, Portugal | FIL: Location |
| Exhibition pavilions | 4 multifunction pavilions of 10,000 m² gross each | FIL: Pavilions |
| Total complex | Over 100,000 m² | FIL: Pavilions |
| Covered exhibition area | 60,000 m², which belongs to the 4 pavilions | fil.pt: Visitantes |
| Climate | Fully air-conditioned; no smoking inside the buildings | fil.pt: regulation page, questions tab |
| At FIL since | 1999, when FIL moved from Junqueira to Parque Expo | fil.pt: Sobre a FIL |
The four pavilions: reference table
Source for every row: FIL: Pavilions (Portuguese version: Pavilhões). Figures are copied as FIL prints them.
| Pavilion | Gross area | Width | Length | Ceiling height | Floor load |
|---|---|---|---|---|---|
| Pavilion 1 | 10,000 m² | 72 m | 142 m | 15 m | 2,000 kg/m² |
| Pavilion 2 | 10,000 m² | 72 m | 142 m | 12 m | 2,000 kg/m² |
| Pavilion 3 | 10,000 m² | 72 m | 142 m | 12 m | 2,000 kg/m² |
| Pavilion 4 | 10,000 m² | 72 m | 142 m | 12 m | 2,000 kg/m² |
Note on length: FIL’s text and its “each pavilion” list give 142 m, while the summary table on the same page prints 141 m. We show 142 m and flag the difference so you can confirm it on the general floor plan (PDF) if a few centimetres matter to your layout.
What each pavilion includes
- A metal grid in the roof structure for mounting suspensions, and “possibility for rigging across entire pavilion” (FIL: Pavilions).
- Floor with equipped technical gutters (cable ducts).
- 14 meeting rooms of 10 to 50 m² on the upper level of each pavilion.
- An installed transformer capacity of 6,250 kVA, air-conditioning, CCTV and fire detection.
- A catering support room and a gate to the loading dock.
Floor plans: general plan, Pavilion 1, Pavilion 2, Pavilion 3, Pavilion 4.
Other FIL spaces
| Space | What FIL says | Source |
|---|---|---|
| Multiuse Pavilion | 1,070 m², between Pavilions 2 and 3, wooden structure, direct access from the pedestrian zone | FIL: Multiuse Pavilion |
| Sony Square | Approx. 15,000 m² outdoors at the north end; used for open-air events or as an area complementary to large events, joining with Pavilion 4 | FIL: Sony Square |
| Grand Hall | Main entrance on the south side, two floors. Floor 0: access to the pavilions, registration, Exhibitor Support Office, ServiFIL, first aid and treasury. Floor 1: press and VIP rooms | FIL: Grand Hall |
| Loading dock | Exterior area with 300 spaces and room to manoeuvre; sometimes used as exhibition space for large equipment; entrance at the north end | FIL: Entrances |
Stand rules from the General Regulation
Source for every row: FIL General Regulation; article numbers in brackets. The English wording is our translation.
| Topic | Rule | Article |
|---|---|---|
| Space module | 9 m² (3.00 × 3.00 m); a stand takes one module or a multiple of it. Spaces come without platforms, walls or partitions | RG 7.1 |
| General stand height | Up to 3 m | RG 7.2 |
| Taller stands | Submitted to FIL’s technical area at least 20 days before build-up starts, with dimensioned plans, elevations and sections | RG 7.2 |
| Second floor | Needs FIL’s express authorisation. The usable upper floor, and any decorative element above 3 m, must be set back at least 1.50 m from the stand perimeter | RG 7.2 |
| Second-floor cost | Extra participation cost of 50% of the built usable area, at the unit price of the space | RG 4.2 |
| Raised floors | Any stand with a raised floor needs a ramp for wheelchair users | RG 7.2 |
| Carpet | Only fire-retardant carpet, fire class M3 | RG 7.3 |
| On-site work | No workshop construction anywhere in the exhibition area; no cutting machines, welding, sanders or spray painting. Stands must be built only by assembling prepared elements | RG 7.4 |
| Venue equipment | Fire hydrants, extinguishers, loudspeakers, signage, CCTV and fire detectors must be respected | RG 7.2 |
| Exhibit loads | Special authorisation for products over 2,000 kg/m² on the pavilion floor, or over 200 kg/m² on a stand’s first floor | RG 5.4 |
| Hanging from the building | Only with FIL’s authorisation and only by FIL’s concessionaires, at FIL’s price list. Request at least 20 days before the event, with the suspension project and the weights | RG 7.16 |
| Walls and structure | No hanging or fixing of exhibits, decoration or construction elements on pavilion walls or structural elements without FIL’s express authorisation | RG 7.17 |
Electricity and services
| Topic | Rule | Article |
|---|---|---|
| Supply | 230/400 V, 50 Hz | RG 7.5 |
| Stand installation | The exhibitor’s responsibility. It must follow Portugal’s low-voltage safety regulation, with residual-current main switches and a protective earth, and be done by an electrician accredited by the DGE or the electricians’ union | RG 7.2 |
| Connection to the grid | Only by FIL’s services, which inspect all electrical work. The exhibitor names the person responsible for the stand’s electrical layout | RG 7.6 |
| Ordering | Water, drainage, power and telecoms go on the registration form, with the power to be installed. Special lines not on the form: request from FIL 20 calendar days before build-up; they are quoted separately | RG 7.8 |
| Stand cleaning | The exhibitor’s responsibility; may start no earlier than one hour before the show opens | RG 7.10 |
| VAT | 23% | fil.pt: regulation page, questions tab |
Source for the RG rows: FIL General Regulation.
Contractors, build-up and dismantling
- Contractor accreditation: companies doing build-up and decoration must be accredited in advance, with a civil and professional liability policy of €1,000,000 covering damage to the venue, third parties and stoppage of FIL activities (RG 6.2).
- Starting work: build-up begins only with the build-up credential and build-up passes (RG 6.1). Passes for build-up staff are ordered on the registration form and must be worn visibly (RG 9.1).
- Hours: build-up and dismantling hours are set by FIL for each event. Work outside them needs FIL’s express authorisation and an extension fee; both hours and fee appear in the Exhibitor Dossier (RG 6.6).
- Completion: stands must be finished by the time FIL indicates, or the stand does not open (RG 6.5).
- Aisles: no loading or unloading in aisles in line with the outdoor gates, so forklifts and lifts can circulate, unless it is the only way to reach the stand (RG 6.8).
- Dismantling: not before the official closing time (RG 7.11), and finished within FIL’s deadlines. After that, FIL may remove the materials and charge the costs (RG 7.12). The space is handed back in the condition received (RG 7.14).
- Loading dock access: through the north end of FIL, with authorisation (fil.pt: regulation page, questions tab).
Money and timing
| Item | Rule | Article |
|---|---|---|
| Space payment | 50% with the participation request; the other 50% by the date in the participation rules | RG 4.3 |
| Shell stand and services | 50% up front; the rest before build-up starts | RG 4.4 |
| Cancellation | Up to 60 calendar days before build-up: the initial payments are charged. After that: the full participation cost | RG 4.7 |
| Invoice queries | Within five working days of receipt | RG 4.6 |
| Exhibitor passes | Up to 3 modules of 9 m²: 6 passes; one more pass for each additional module | RG 9.1 |
| Insurance | FIL provides general security; exhibitors guard their own goods and take out specific insurance covering theft | RG 10.1 |
Source: FIL General Regulation.
Getting there and parking
| Item | Official figure | Source |
|---|---|---|
| Underground car park | 830 spaces, north entrance (by Sony Square) and south entrance (Rua do Bojador), lift or stairs to all four pavilions | FIL: Entrances |
| Parking around the venue | More than 10,000 spaces | FIL: Entrances |
| Airport | Humberto Delgado Airport, 4 km (approx. 7 minutes) | FIL: Location |
| Public transport | Oriente station: train, city bus, express bus, Metro Red Line and taxi | FIL: Location |
| By road | A5 motorway and Vasco da Gama Bridge | FIL: Location |
What this sheet leaves out
FIL publishes no venue-wide figures for the following, so we have not estimated them:
- an absolute maximum stand height;
- fire classes for stand materials other than carpet;
- load limits per rigging point;
- standard build-up and dismantling hours;
- door or gate sizes;
- column positions;
- power and service prices.
Check your event’s participation rules and Exhibitor Dossier, or ask FIL’s technical area, for these items.
Related FIL Lisbon pages on our site
- FIL Lisbon: technical preparation for an exhibition stand (step-by-step process)
- Lisbon trade fair calendar 2027
- Tektónica 2027 at FIL: exhibition stand guide
Fair guides: Sagalexpo, Expodentária.
Need a stand that passes FIL’s technical review first time?
Adam Expo Stand is based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal. The company was founded in 2018, Adam Dragos has worked in exhibitions since 2005, and we have delivered 639+ projects in 12+ countries. We design, build and install stands. Because FIL bars on-site workshop construction, our fabrication is completed before the stand reaches Lisbon, so it only has to be assembled in the pavilion. As a rough guide, modular stands cost approx. €280–380/m², custom wood approx. €450–650/m² and double-deck approx. €750–1,100/m². Your quote depends on the brief.
Send us your event, pavilion and stand size and we reply within 24 hours. Contact us for your Lisbon stand or see our Lisbon and Portugal stand builder page.