FYCMA Málaga Exhibitor Guide: Stand Rules, Halls and Dates

Last updated:

FYCMA, the Palacio de Ferias y Congresos de Málaga, offers 17,000 m² of exhibition halls in two connected spaces, and its general rules cap free-design stands at 5 m in the halls unless the fair’s own rules say otherwise. Plan and elevation drawings must be approved by FYCMA’s Technical Department one month before the show starts, and build-up runs from 8:30 to 21:30.

Quick facts

What is FYCMA and where is it?

FYCMA is Málaga’s trade fair and congress center and belongs to Málaga City Council. It sits on Avenida Ortega y Gasset and hosts trade fairs, congresses, concerts and corporate events. For exhibitors, the important point is that FYCMA is both the venue and, for many shows, the organizer. FYCMA itself organizes H&T and Greencities, so the venue rules and the fair rules often come from the same team.

FYCMA’s own site describes 17,000 m² of halls in two connected exhibition spaces, and its downloads page publishes floor plans for Pabellón 1 and Pabellón 2. The venue also has two auditoriums, conference rooms, a multipurpose hall (Sala Polivalente) and other rooms. Floor plans for each space are free to download from the FYCMA downloads page. Ask your organizer which plan your fair uses before you design anything.

Which fairs are coming up at FYCMA?

FYCMA’s official calendar, checked on November 17, 2026, lists these professional events with exhibition areas:

Greencities, the urban intelligence and sustainability forum, was held on September 15–16, 2026. On November 17, 2026, neither FYCMA nor the Greencities site had published dates for the 2027 edition. Check greencities.fycma.com before you plan; we will update this guide when the dates are official. See FYCMA’s full calendar for other events.

How high can a stand be at FYCMA?

Article 24 of FYCMA’s general rules sets the maximum height for free-design stands at 5 m in the halls and 3.25 m in the Sala Polivalente, when the fair’s specific rules do not set another limit. Some fair contracts phrase this differently. For example, the H&T contracting conditions (PDF) name “Pabellón 3” for the 3.25 m limit. Always follow the document for your fair.

The same article adds rules that shape the stand’s outline:

  • Blind walls facing an aisle, counting walls, banners, glass, panels or plants, may not exceed 50% of the stand’s total length. Beyond that, the wall must step back into the stand by half its height.
  • Back faces must have a finish similar to the interior, with no logos or lettering.
  • Accessibility rules for people with disabilities apply.
  • Fire reaction: floor coverings Bfl-s1 or better; walls and ceilings B-s1,d0 or better; curtains Class 1 under UNE-EN 13773.

Note the fire class. FYCMA’s general rules ask for B-s1,d0 on walls and ceilings, which is stricter than the C-s2,d0 used at IFEMA Madrid and Fira Barcelona. Do not assume a stand built for Madrid passes in Málaga without checking materials.

Can you hang structures from the FYCMA roof?

Yes, with prior authorization. Under Articles 24 and 25.1, structures hang from the roof’s steel beams with protected slings, at a maximum of 150 kg per hanging point and with points at least 2 m apart. Slings must wrap the beam completely, fixing to the lower flange is not allowed, and the horizontal force across the beam may not exceed 7.5 kg per point.

Height limits for hung structures: the top may not exceed 6.5 m above the floor, or 6 m where it meets air-conditioning ducts. The bottom may not be lower than 3 m, and there must be at least 1.2 m between the bottom of the hung element and the top of the stand. Every item on a truss, such as speakers or lights, needs an extra safety cable that can hold its full weight.

Hanging is not allowed in auditoriums, conference rooms or other rooms with floating or removable ceilings. Suspended structures need FYCMA’s prior approval and a project by a qualified technician showing that the loads are within the limits.

What do two-storey stands need at FYCMA?

Article 25 says the organizer may authorize stands with two or more floors. The project must meet all the free-design rules and include detailed drawings signed by an architect and endorsed by the relevant Málaga professional association, with a project certificate and a site-supervision certificate. The upper floor must step back 1 m from the lower floor on sides facing an aisle. For billing, each upper-floor square meter counts as 50% of a ground-floor square meter. Our double-deck stand guide explains the design side.

How do build-up and deliveries work?

  • Working hours: build-up, dismantling and work inside the venue run from 8:30 to 21:30 (Article 22). Extensions must be requested at least 24 hours in advance and paid in advance.
  • Access: builders and materials enter only through the loading and unloading accesses.
  • Vehicles: FYCMA sets the rules for each event and generally limits unloading in the loading yard to one hour (Article 23).
  • Floor load: hall floors take up to 2,000 kg/m²; rooms take up to 300 kg/m² (Article 21). Avoid point loads at corners and edges, and never load the covers of service channels.
  • Approval: FYCMA’s Technical Department must see and approve the dimensioned plan and elevation one month before the show starts (Article 24).

FYCMA Málaga: key figures for exhibitors

Data point Value Source (linked) Date checked
Exhibition halls 17,000 m² in two connected spaces FYCMA, Organize Nov 17, 2026
Auditoriums 900 and 600 seats Same page Nov 17, 2026
Max free-design stand height 5 m in halls; 3.25 m in Sala Polivalente (unless fair rules differ) FYCMA general rules, Art. 24 Nov 17, 2026
Blind walls to aisle Max 50% of stand length, or set back by half the wall height Same document, Art. 24 Nov 17, 2026
Hanging points Max 150 kg per point; at least 2 m apart Same document, Art. 24 and 25.1 Nov 17, 2026
Hung structure height Top max 6.5 m (6 m at ducts); bottom min 3 m Same document, Art. 24 Nov 17, 2026
Wall and ceiling fire class B-s1,d0 or better Same document, Art. 24 Nov 17, 2026
Plan approval One month before the show starts Same document, Art. 24 Nov 17, 2026
Build-up working hours 8:30–21:30 Same document, Art. 22 Nov 17, 2026
Hall floor load Up to 2,000 kg/m² Same document, Art. 21 Nov 17, 2026
AES design and build rates (approx.) Modular approx. €280–380/m²; custom wood approx. €450–650/m²; double-deck approx. €750–1,100/m² AES price calculator Nov 17, 2026

Quotable summary: FYCMA Málaga offers 17,000 m² of connected exhibition halls; its general rules cap free-design stands at 5 m, allow 150 kg per roof hanging point and require plan approval one month before the show.

How do FYCMA rules compare with IFEMA and Fira Barcelona?

The general height at FYCMA (5 m) matches Fira Barcelona Gran Via and is higher than IFEMA’s general 4 m. Hanging is lighter: 150 kg per point at FYCMA, while IFEMA’s rigging regulations allow 500 kg at beam connections in Halls 1–10. FYCMA also asks for a stricter wall and ceiling fire class. If your stand travels between Madrid, Barcelona and Málaga, check three things before each show: height, hanging loads and material certificates. Our IFEMA rules guide and Fira Barcelona technical guide cover the other two venues.

What does a stand at FYCMA cost?

Our calculator rates are approximate: modular from approx. €280–380/m², custom wood from approx. €450–650/m² and double-deck from approx. €750–1,100/m². Floor space, power, cleaning and other venue services are booked with FYCMA or the organizer and are separate. Transport from Madrid and the size of your build-up window also affect the total. Start with the exhibition stand cost calculator.

FYCMA exhibitor checklist

  • Get your fair’s specific rules and the hall plan. Check whether they change the 5 m height.
  • Count blind aisle walls against the 50% limit.
  • Confirm wall and ceiling materials reach B-s1,d0.
  • Plan any hanging elements within 150 kg per point and 2 m spacing.
  • Send dimensioned plans and elevations at least one month before opening.
  • Book unloading slots; plan for the one-hour yard limit.

Plan your FYCMA stand with us

We are Adam Expo Stand, founded in 2018. Adam has worked in exhibitions since 2005, and we have completed 639+ projects in 12+ countries. Based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal. We design, build and install stands and reply within 24 hours. Request a free 3D design consultation.