MOMAD 2027 runs from 4 to 6 February 2027 at IFEMA MADRID, Pavilion 4, from 10:00 to 19:00, next to Bisutex and overlapping with Intergift (3 to 6 February). IFEMA’s exhibitor guide already fixes the hard dates: space paid in full by 15 December 2026, free-design stand projects uploaded to Zona Expo by 29 December 2026, and build-up from 31 January 2027.
Last updated: November 2026
This guide is for fashion, footwear and accessories brands deciding how to build a MOMAD stand in February 2027, and for the people who will brief the builder. It uses only IFEMA MADRID’s official MOMAD pages and the MOMAD exhibitor guide and specific rules (version v4 online on 25 November 2026), plus Adam Expo Stand’s approximate calculator rate. It comes from a company that designs, builds and installs exhibition stands. It is not the exhibitor manual, and the guide and Zona Expo always prevail.
When and where is MOMAD in 2027?
MOMAD 2027 takes place from 4 to 6 February 2027 at IFEMA MADRID, Avenida Partenón 5, 28042 Madrid, in Pavilion 4, open to professionals from 10:00 to 19:00 each day. Bisutex runs alongside it, and Intergift, the decoration and gift fair, runs from 3 to 6 February, according to IFEMA’s official pages.
The dates, the hours and the pavilion come from the official schedule page, and IFEMA’s press release of 16 November 2026 confirms the joint February dates. Exhibitors can enter the grounds from 09:00 and must leave before 19:30, and exhibit material cannot be removed before 19:00 on 6 February. The virtual side of the fair, on Liveconnect, is open from 15 January to 15 March 2027.
The pavilion matters for your design. The July 2026 edition, IFEMA’s first July MOMAD, used Pavilion 5, and IFEMA reported more than 200 brands there, 50 of them new, with 60% Spanish. Those are organizer-reported results for another edition and another hall, so confirm your own hall and plan in Zona Expo before you fix a layout. For other IFEMA dates around it, see our Madrid 2027 IFEMA calendar, and if you also exhibit at the neighboring gift fair, read our Intergift 2027 stand planning guide.
Which stand formats does IFEMA offer at MOMAD?
The guide offers a free-design, floor-only stand for companies requesting 30 m² or more, with the project approved by IFEMA, and a turnkey basic or general modular stand from 12 m². There are also three 12 m² formats: EGO for emerging brands, Sustainable Experience, and a MOMAD 4.0 stand for retail-solution companies.
EGO is reserved for designers and newly created brands with a maximum market presence of one year and six months and a limited collection. Sustainable Experience is aimed at designers and companies working with sustainable criteria. MOMAD 4.0 is for companies offering retail solutions such as e-commerce, logistics, payment platforms and digital marketing.
IFEMA does not accept every application. The guide says the decision is at IFEMA’s discretion, based on the purpose of the fair and the space available, and that it weighs the quality of the collections, the added value they bring, the commitment to sustainability and the handmade character of the proposals. If your brand is a good fit, the next question is size.
A common mistake is treating the 12 m² modular and the 30 m² free-design stand as the same job at different scales. A 12 m² modular package is mostly a graphics, product and lighting decision inside IFEMA’s panels. A 30 m² free-design stand is an architectural brief with a project to approve. Our stand sizes guide shows how 3×3, 6×3 and island plots behave on a hall floor.
What exhibitor deadlines apply to MOMAD 2027?
The official calendar sets 15 November 2026 for the first 50% of the space payment, 15 December 2026 for 100% of space and contracted services, 29 December 2026 for free-design projects and rigging requests, and 22 January 2027 for interior decoration of modular stands. From 24 January 2027, late service orders carry a 25% surcharge.
| Date | What the exhibitor guide requires |
|---|---|
| 15 November 2026 | Deadline for the first 50% of the contracted space. The reservation is not formalized until it is paid. |
| 15 December 2026 | Deadline for 100% of the space and contracted services. |
| 29 December 2026 | Free-design projects uploaded to Zona Expo. A hung or rigging structure needs its own request by the same date. |
| 1 January 2027 | Last day of the 5% discount on services contracted through Zona Expo (30 days before build-up). |
| 16 January 2027 | Stand signage communicated through Zona Expo. |
| 17 January 2027 | Layout plan for a modular stand uploaded to Zona Expo (15 days before build-up). |
| 22 January 2027 | Modular stands with interior decoration (panels, profiles, totems, platforms, truss) must update their project in Zona Expo. |
| From 24 January 2027 | 25% increase on late orders for assembly rights and other services. |
As of 25 November 2026 the first payment date has already passed. If you have not applied yet, ask IFEMA through the exhibitor page what space is still open before you plan a stand around a plot you do not hold. We cannot see IFEMA’s availability, and we do not guess it.
The practical consequence for a free-design stand is the date at the end of December. Drawings, structure and any hanging elements must be settled before the Christmas break, which, as of 25 November 2026, leaves about five weeks until the project upload. Our IFEMA costs and deadlines guide explains how IFEMA’s approval step works in general.
What are the build-up and dismantling windows?
Free-design stands can be built from 31 January to 2 February 2027: 08:30 to 19:30 on 31 January, and 08:30 to 21:30 on 1 and 2 February. Modular stands are handed over on 3 February from 08:30, the show runs 4 to 6 February, and dismantling is on 7 February (08:30 to 19:30) and 8 February (08:30 to 21:30).
Goods can enter on 3 February from 08:30 to 21:30. From 19:00 that evening only the pedestrian doors are open, because IFEMA closes the goods gates to lay recyclable carpet in the aisles. Goods leave on 6 February from 19:30 to 24:00, with pedestrian doors only from 19:30 to 20:30 for the same carpet removal.
One caution about the guide itself. A line in its text prints the dismantling days as 7 and 8 February 2026, while its calendar table gives 7 and 8 February 2027. We use 2027, which fits every other date, but confirm it with IFEMA’s exhibitor line when you contract.
Three safety and housekeeping rules affect the work plan. Helmet, high-visibility vest and safety footwear are mandatory during build-up and dismantling. No work may start before IFEMA receives the occupational-risk coordination protocol. Storing packaging inside the pavilions is forbidden. For hall data, goods gates and general IFEMA rules, use our IFEMA Madrid venue guide for exhibitors.
Which build rules shape a MOMAD stand?
The specific rules cap every stand element at 2 m from the pavilion floor, platform included, and allow hanging elements such as truss, banners or cubes between 3 m and 6 m with a 1 m setback from the perimeter. A second floor is allowed only on perimeter spaces against the pavilion wall or opposite the cafeteria at the back.
That 2 m limit is lower than the 4 m maximum in IFEMA’s general rules, which we summarize on our venue sheet. The general rules say a show’s specific rules prevail, so for MOMAD the 2 m figure is the one to design to. Every stand must also build at least the party walls against the pavilion wall and neighboring stands, and mark the plot with the official stand number.
Other points from the guide: a pavilion column inside your stand can carry a foam board, panel or banner, but it must not be glued or fixed to the column, and the technical secretariat must approve it. IFEMA carpets the aisles with reusable strips and leaves a narrow uncarpeted edge beside the stands. That edge belongs to the aisle, and covering it is charged as space.
The guide lists assembly-right tariffs in three types, by stand construction, and a 25% surcharge for late orders. We do not copy the euro amounts here. The Spanish and English editions of the guide print slightly different figures for the same tariff, and IFEMA’s rules say the Spanish text prevails. Read the tariff in Zona Expo for your contract.
In practice, a 2 m cap changes the design logic. The brand wall, the product display and the lighting carry the stand, and the only vertical statement is a truss or banner hung between 3 m and 6 m with the setback. A tall closed tower is not an option. That is an advantage for a small brand, because it keeps the structure light and reusable. See our reusable exhibition stands page if the same stand must travel to another fair.
How much does a MOMAD stand cost to design and build?
Adam Expo Stand’s exhibition stand cost calculator starts from approx. €280/m² for design, build and installation. That is an approximate entry figure, not a quote, and it does not include IFEMA’s space, assembly rights, electricity, insurance or any other official service.
What moves a real budget is not the m² figure alone. The stand type matters first: a 12 m² IFEMA modular package is contracted with IFEMA, while a free-design stand of 30 m² or more is the format where a builder designs, builds and installs a stand of its own. After that come graphics, lighting, furniture, storage and any hung element. Run the calculator with your actual plot size, or use the free AI stand designer to test a layout before the briefing call.
Organizer costs sit on top and must be read in Zona Expo. If you want a first budget conversation, send us the plot size, the stand type you hold or are negotiating, and whether the stand must be reused. We aim to reply within 24 hours.
First time exhibiting at MOMAD: what do you do, in order?
Start with the official sequence: read the exhibitor guide and the general participation rules, send the participation request on IFEMA’s MOMAD page, wait for IFEMA’s space proposal, and manage everything else in Zona Expo. Brief a builder only once you know your stand type, size and hall.
- Read the documents. The exhibitor page lists the guide, the general rules, security advice and a sustainability guide, all as PDFs.
- Send the participation request. The form on ifema.es/momad is the start of the process. The guide says you can request information and quotes from the same form without it counting as an offer request and without paying a reservation fee.
- Accept IFEMA’s proposal in writing. IFEMA proposes one or more spaces by stand type and size. Accepting the offer in writing, by email or by signature formalizes the contract, and the first 50% payment falls due on the date in the calendar.
- Decide the format. Under 30 m² you are in a modular format. At 30 m² or more you can choose floor-only free design.
- Manage your participation in Zona Expo. Services, exhibitor passes and invitations for your customers are handled there. IFEMA’s FAQ says invitation codes are generated by the exhibitor in Zona Expo.
- Brief your builder before the project deadline. For free design that is 29 December 2026. Send plot size, hall, any hanging element and your product list.
- Use Liveconnect. The online platform is open from 15 January to 15 March 2027 and gives you a place to follow up contacts after the fair.
A realistic first-time plan has three goals only: a clear product story on the brand wall, a counter or table where a buyer can sit, and one reason to return after the fair. Everything else is decoration.
MOMAD 2027 in figures
These are the figures an exhibitor can quote in an internal brief. Each line comes from the official MOMAD pages or the exhibitor guide cited, or from Adam Expo Stand’s calculator. Where IFEMA has not published a figure, it is left out.
| Item | Verified figure | Source (checked 25 Nov 2026) |
|---|---|---|
| Dates and hours | 4–6 February 2027, 10:00–19:00 | IFEMA MOMAD schedule |
| Venue and pavilion | IFEMA MADRID, Pavilion 4 | Same schedule page |
| Coinciding fairs | Bisutex; Intergift 3–6 February | IFEMA press release, 16 Nov 2026 |
| Free-design minimum | 30 m², floor only | Exhibitor guide v4 |
| Modular minimum | 12 m² | Exhibitor guide v4 |
| Payments | 50% by 15 Nov 2026; 100% by 15 Dec 2026 | Exhibitor guide v4, calendar 1.10 |
| Free-design project upload | By 29 December 2026 | Exhibitor guide v4, calendar 1.10 |
| Build-up | 31 Jan 2027 08:30–19:30; 1–2 Feb 08:30–21:30 | Exhibitor guide v4 |
| Dismantling | 7 Feb 08:30–19:30; 8 Feb 08:30–21:30 | Exhibitor guide v4 (calendar table) |
| Maximum stand element height | 2 m; hanging elements 3–6 m with 1 m setback | Exhibitor guide v4, free-design rules |
| Approximate AES build cost | From approx. €280/m² | AES cost calculator |
Quotable line: MOMAD 2027 runs 4–6 February 2027 in IFEMA Pavilion 4, with space payment due in full by 15 December 2026 and free-design stand projects due in Zona Expo by 29 December 2026 (IFEMA exhibitor guide v4, checked 25 November 2026).
Ready to brief a MOMAD stand?
If you hold a plot, or are about to, send the square meters, the stand type and the hall, and tell us whether the stand must travel to another fair. We design, build and install the stand, and we aim to reply within 24 hours. Request a free 3D design consultation on our contact page.
For the wider picture, read about our exhibition stand builder in Madrid and our IFEMA Madrid venue guide.
Adam Dragos is the founder of Adam Expo Stand and Exhibitor Success Specialist since 2005. The company was founded in 2018 and is based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal, with 639+ projects in 12+ countries.
Related reading: Madrid trade fair calendar 2027, Intergift 2027 stand planning, stand sizes, reusable exhibition stands and the free AI stand designer.
