An exhibition stand builder for international trade shows should be assessed against a written delivery scope: the event and plot, visitor activities, design outputs, technical submissions, production, transport, installation, support and return arrangements. Ask who performs each task and what evidence will show that it is complete.
For an exhibitor coordinating from another country, clear responsibilities and decisions are especially useful. This guide explains what to put in the brief and how to compare a builder’s proposal before committing to the project.
Give the exhibition stand builder a usable international brief
Start with the event name, dates, venue, hall, plot number and current organiser documents. Include the dimensioned plan, open sides and booking inclusions. State which details remain provisional and when the team expects to confirm them.
Describe the audience and intended activities in concrete terms: a product demonstration, an application discussion, a meeting or an introduction. Supply actual product dimensions, weights and operating needs where known. Identify the people who can approve design, technical information, artwork and commercial changes.
Use the AUMA trade-fair briefing guidance as a starting point for aligning objectives, resources, responsibilities and communication. Add the particulars of the event; a general briefing guide does not replace organiser instructions.
Compare responsibilities before comparing the total price
| Work package | Ask the builder to specify | Agree how to verify it |
|---|---|---|
| Design | Layout, elevations, visuals, finishes and included revisions | Approved drawings and documented decisions |
| Technical coordination | Required information, submission owner, deadlines and specialist input | Submission record and the relevant organiser response |
| Production and graphics | Materials, dimensions, artwork requirements, proofs and acceptance points | Agreed specification, samples or relevant production checks |
| Transport and handling | Collection, delivery, venue handling, empty packaging and return scope | Named parties, booking arrangements and item inventory |
| Installation and handover | Access arrangements, services, commissioning and completion criteria | On-site checklist and outstanding-item record |
| Event support | Contact, hours, included assistance and escalation process | Written support arrangements shared with the exhibiting team |
| Dismantling and next use | Return destination, condition checks, repairs, storage and disposal responsibilities | Inventory and documented condition after the event |
“Turnkey” should introduce this scope discussion. It does not prove that every organiser fee, technical service, approval, insurance requirement or exhibitor responsibility is included. A single project contact can coordinate work while other parties retain specific responsibilities.
Ask for evidence relevant to your project
Request examples that resemble the proposed activities, size, construction or event conditions. Ask what the supplier delivered and which parts were handled by others. A photograph can show a completed setting, but it cannot establish the full contract scope, environmental performance or commercial return.
Our Alphacan project at VETECO, IFEMA MADRID provides published visual project context. Use any case study as a starting point for specific questions about responsibilities and suitability; do not treat it as a forecast of results for another exhibitor.
Agree how subcontracted services will be coordinated, who is responsible for the final deliverables and who can authorise changes. Relevant experience helps frame these questions, but a statement about experience is not a guarantee of an incident-free installation.
Choose a construction approach around the programme
Custom construction can accommodate a particular design brief within the applicable structural, production, budget and venue constraints. It does not provide unlimited freedom. Modular systems need to be checked against their actual components, finishes, permitted configurations and planned plots.
Rental and ownership are commercial arrangements to compare alongside construction. Confirm what can be customised, what must be returned, what storage or repairs may be required and who owns the graphics and reusable components. Rental is not automatically the cheaper complete programme.
For a multilevel stand, request a project-specific feasibility review and identify the additional design, structural, access and approval requirements. Additional floor area should be evaluated against the permitted usable plan and complete cost. For a shared pavilion, agree common services, participant allocations, branding, approvals and shared costs.
Coordinate the international delivery calendar
Work backwards from the actual access, service-order and submission dates. Put design approval, product information, artwork, specialist review, production release, transport booking, installation and handover into one calendar. Assign an owner to each dependency.
Ask the builder to confirm feasibility for the proposed scope and available dates. A generic lead time cannot establish that a particular custom, modular or rental proposal can be delivered. Record what must change if a decision or supplier item is late, and require approval of the resulting cost or scope change.
Check the documents for the event and site. The IFEMA MADRID regulations library illustrates why this selection matters: it lists different documents for IFEMA fairs, externally organised events and other facilities. The builder’s coordination role should be distinguished from an organiser’s decision.
Make remote decisions traceable
Agree a working language, meeting schedule, project contacts and location for the approved documents. Review drawings with clearly labelled dimensions and version dates. Confirm which artwork, material sample or layout is being approved, rather than relying on an informal message such as “looks good”.
Use a change record containing the requested alteration, reason, drawing version, price, delivery impact and approving person. Include the exhibitor’s own shipments and information so that the builder’s plan reflects the whole installation.
Review cost and reuse with explicit assumptions
Compare quotations for the same scope and list exclusions, taxes, third-party charges and provisional items. Include applicable participation, services, handling, support and return costs without counting an included item twice. Obtain current project prices rather than relying on a universal euro-per-square-metre rate.
If reuse is proposed, request an inventory, expected future configurations, packing plan and responsibilities for storage and repairs. Assess environmental claims against specific materials, documentation, transport and actual reuse plans. Wood, plants, LEDs or a modular label alone do not demonstrate a lower total environmental impact.
Frequently asked questions
What should an international exhibitor send first?
Send the event and plot details, available organiser documents, intended activities, product requirements, budget scope and decision contacts. Mark missing or provisional information.
Does a turnkey builder handle everything?
The written agreement determines the scope. Confirm organiser services, submissions, charges, exhibitor shipments, support, dismantling and return responsibilities separately.
How should the completed stand be accepted?
Check it against the approved drawings, specification and operating needs. Test equipment and services, record outstanding items and agree who will resolve them before opening.
See our exhibition services and send your international event brief to discuss the required scope.
Follow our exhibition planning guides
Choose Adam Expo Stand as a preferred source to help you find our exhibition guides and updates on Google.
Add as a preferred source on GoogleGoogle may ask you to sign in and confirm your choice.