Exhibition Stand Builder at Feria de Zaragoza

Adam Expo Stand designs and builds custom and modular exhibition stands for exhibitors at Feria de Zaragoza, with turnkey delivery from design to dismantling. Stands start from €120/m², and we reply to every brief within 24 hours. In 2027 the venue hosts ENOMAQ in January, SMAGUA and SPAPER in February and FIGAN in March.

Quick facts

  • Since 2018, 639+ projects
  • Adam in trade fairs since 2005
  • Based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal.
  • Custom wood carpentry design and build, Aluvision and beMatrix modular systems, and turnkey stands
  • Bilingual team working in English and Spanish

Who builds exhibition stands at Feria de Zaragoza?

Adam Expo Stand designs and builds exhibition stands for companies exhibiting at Feria de Zaragoza. We handle the concept, technical project, production, transport, build-up, on-site support and dismantling, and we coordinate the venue paperwork so the exhibitor deals with one contact instead of several suppliers and offices.

Our work at this venue follows the same method we use across Spain and Portugal. We start from the fair’s technical rules, the plot the organizer assigns and the products you will show. For machinery fairs that means planning delivery, services and visitor flow around the equipment first, then designing the stand around it. For a city overview, see our guide to the exhibition stand builder in Zaragoza.

What is Feria de Zaragoza?

Feria de Zaragoza is the exhibition venue of Zaragoza, open since 1941, with more than 360,000 m² of facilities, 11 pavilions, outdoor areas and a Palacio de Congresos with an auditorium. The organizer describes its location at the heart of the Madrid, Barcelona, Bilbao and Valencia axis, connected by road, AVE high-speed rail and airport.

These facts come from the official Feria de Zaragoza venue page. For exhibitors, three points matter most:

  • Scale and outdoor space. Eleven pavilions plus outdoor areas mean that large machinery fairs can combine indoor stands with open-air displays. Ask the organizer early whether your plot is indoors, outdoors or both, because the stand design changes completely.
  • Two venues in one organizer. Feria de Zaragoza also runs the Palacio de Congresos, which has its own technical rules. Confirm which building your event uses before you start the design.
  • Connections. The AVE high-speed line, the airport and the road network make it practical to move a stand, a team and visiting clients from Madrid, Barcelona, Bilbao or Valencia.

Which trade fairs take place at Feria de Zaragoza in 2027?

Four trade fairs at Feria de Zaragoza have 2027 dates published on the organizer’s website: ENOMAQ from 26 to 28 January, SMAGUA and SPAPER from 16 to 18 February, and FIGAN from 16 to 19 March. CITY.360, a first-edition fair for mayors and public administrations, runs alongside SMAGUA on 17 and 18 February.

Fair Sector 2027 dates Source
ENOMAQ (25th edition) Machinery and techniques for growing, processing and packaging beverages and liquid foods 26–28 January 2027 ENOMAQ
SMAGUA (28th edition) Water, irrigation and the environment 16–18 February 2027 SMAGUA technical information
SPAPER (5th edition) Machinery and equipment for pulp, paper and board 16–18 February 2027 SPAPER
CITY.360 (1st edition) Mayors and public administrations 17–18 February 2027 SMAGUA 2027 press release
FIGAN (18th edition) Livestock production, innovation and technology 16–19 March 2027 FIGAN technical information

Two well-known Zaragoza fairs are not on the 2027 calendar. The organizer already promotes the next edition of FIMA, the agricultural machinery fair, as FIMA 2028, and SMOPYC, the public works, construction and mining machinery fair, held its 20th edition in April 2026. For ENOMAQ in detail, read our ENOMAQ 2027 machinery arrival brief.

How do build-up windows work at Feria de Zaragoza?

Each fair at Feria de Zaragoza publishes its own build-up and dismantling dates. For SMAGUA 2027, stands are built from 11 to 15 February 2027, machinery can enter until 14 February, and 15 February is reserved for stand decoration only, with no vehicles allowed into the halls.

The published windows for the first fairs of 2027 are:

Fair Build-up Machinery entry and last day Dismantling Source
ENOMAQ 2027 21–24 January 2027, 08:30–20:00 Last set-up day 25 January 2027 See the organizer’s technical rules ENOMAQ technical information
SMAGUA 2027 11–15 February 2027, 08:30–20:00 Machinery until 14 February; 15 February decoration only 18 February 19:00–22:00; 19–21 February 08:30–20:00 SMAGUA technical information
FIGAN 2027 11–15 March 2027, 08:30–20:00 15 March decoration only, no vehicles in the halls 19 March 17:00–22:00; 20–22 March 08:30–20:00 FIGAN technical information

The rule that matters most for machinery is the split between heavy work and decoration. Machines, forklifts and structural work must finish before the decoration day, so we schedule the machine delivery first, build the stand around it, and keep the final day for graphics, lighting, cleaning and product placement.

What venue rules should you check before building at Feria de Zaragoza?

Check four sets of documents: the general rules for stand construction and decoration, the specific rules on stand dimensions, the service for inspecting suspended elements and installing hanging points, and the health and safety coordination forms. Feria de Zaragoza publishes them for exhibitors and stand builders in its Decorator’s Corner.

What each document means in practice:

  • Construction and decoration rules. The Decorator’s Corner holds the general rules for building and decorating stands, plus separate documents with specific dimension rules for the exhibition halls and for the Palacio de Congresos. We design to those limits from the first sketch.
  • Suspended elements. The venue offers an inspection service for suspended elements and the installation of hanging points. If your design includes a hanging banner or truss, it goes through that service.
  • Health and safety. The risk prevention page covers information on subcontracting, the appointment of a person responsible for health and safety, and a coordination protocol between the venue, the exhibitor and a signed declaration. We prepare this documentation for every build.
  • Participation rules. Under the general participation rules, stand build-up cannot start until the space has been paid in full, the organizer may change the location or shape of an assigned space for technical or organizational reasons, and exhibitors have no acquired right to the space they used at a previous edition.

The last two points affect design timing. We confirm the final plot plan with you before production, and we keep the design flexible enough to adapt if the organizer adjusts the space.

How should you brief a stand for Feria de Zaragoza?

A good brief for Feria de Zaragoza covers the fair and plot, whether the space is in a pavilion or outdoors, the products or machines you will show, the services they need, the meetings you plan to hold, and the date the organizer confirmed your space. With that, we can return a first design proposal quickly.

The checklist we send exhibitors:

  1. Fair, pavilion and plot. Plot size in m², number of open sides and the organizer’s floor plan.
  2. Indoor or outdoor. Outdoor plots need a different structure, weather protection and a separate delivery plan.
  3. Exhibits. Dimensions and weights of machines or large products, and whether any will run during the fair.
  4. Services. Electricity, water, compressed air and internet, ordered through each fair’s services form.
  5. Meetings and storage. How many people you expect to host at once, and how much stock or literature you need on site.
  6. Brand assets. Logo files, product images and any graphics from earlier fairs that can be reused.

Which type of stand works best at Feria de Zaragoza?

Most exhibitors at Feria de Zaragoza choose between three routes: custom wood carpentry for a stand built around the brand and the machines, an Aluvision or beMatrix modular system that can travel between fairs, or a turnkey package that includes design, furniture, graphics and services. Many combine a modular base with custom elements.

Build route When it fits at Feria de Zaragoza Reuse
Custom wood carpentry design and build Brand counters, machine plinths, premium meeting areas Selected elements stored and reused
Aluvision or beMatrix modular Exhibitors attending several fairs a year, such as SMAGUA and FIGAN Frames and panels reconfigured per fair
Turnkey Companies without an events team in Spain Depends on the structure chosen

At machinery fairs the product is often the strongest stand element. We keep the structure clean around it, use lighting to frame the working area, and place screens where they explain what visitors cannot see inside the machine. Our modular stands and turnkey solutions pages explain each option, and our sustainability services page explains how reuse supports an eco-friendly approach.

How much does a stand at Feria de Zaragoza cost?

Stands start from €120/m². The final price depends on the design, materials, plot size, number of open sides and the services the exhibits need. Space rental and the services you order from the organizer are paid separately to Feria de Zaragoza under each fair’s own contract.

That minimum is a starting point rather than a quote. The lines that change the total most at this venue are:

  • Space rental, priced by the organizer for each fair.
  • Venue services, such as electricity, water, compressed air, cleaning and internet, ordered through the services form.
  • Machinery handling and outdoor work, when exhibits arrive on trucks or the plot is outside.
  • Transport and storage of the stand between fairs.

For a first range, use our exhibition stand cost calculator and test layouts with the AI stand designer.

How far ahead should you plan a stand for Feria de Zaragoza?

Plan a custom stand for Feria de Zaragoza four to six months before the fair, and earlier if machines must be shipped from abroad. The build-up windows are short and fixed: SMAGUA 2027 has five build-up days from 11 to 15 February, with the last day reserved for decoration only.

A practical timeline for a Zaragoza fair:

  1. Six months out: confirm the space and the exhibits; collect machine sizes, weights and service needs.
  2. Five to four months out: design approval, delivery plan and any outdoor structures.
  3. Two to one month out: technical documentation, health and safety forms and service orders.
  4. Two weeks out: transport booked and final graphics approved.
  5. Build-up: machines placed first, then the stand, then decoration on the final day.

Where else in Spain do we build stands?

We serve exhibitors at the main Spanish venues, so one team can follow your fair calendar from Zaragoza to Madrid, Barcelona, Bilbao, Valencia and Seville. Each venue has its own page with verified rules and dates, and our locations hub lists every city and venue we serve.

Adam Expo Stand was founded in 2018, and our founder Adam Dragos has worked in trade fairs since 2005. We are an award-winning, eco-friendly stand designer and builder, and we reply to every brief within 24 hours.

Which stand layout suits a Feria de Zaragoza plot?

Choose the layout by the number of open sides and by how visitors should reach your machines or products. This short video from our @DisenoStandsFerias channel walks through seven common trade show layouts, from inline to island, which is the first design decision for most plots at Feria de Zaragoza.

Data table: Feria de Zaragoza for exhibitors, 2027

Data point Value Source (linked) Date checked
Venue size More than 360,000 m², 11 pavilions, outdoor areas Feria de Zaragoza venue page 10 Nov 2026
Open since 1941 Feria de Zaragoza venue page 10 Nov 2026
ENOMAQ 2027 26–28 January 2027; build-up 21–24 January, last set-up day 25 January ENOMAQ technical information 10 Nov 2026
SMAGUA 2027 16–18 February 2027; build-up 11–15 February SMAGUA technical information 10 Nov 2026
SPAPER 2027 16–18 February 2027, 5th edition SPAPER 10 Nov 2026
CITY.360 2027 17–18 February 2027, 1st edition SMAGUA 2027 press release 10 Nov 2026
FIGAN 2027 16–19 March 2027; build-up 11–15 March FIGAN technical information 10 Nov 2026
FIMA Next edition promoted as FIMA 2028 FIMA 10 Nov 2026
Build-up start Only after the space is paid in full Participation rules 10 Nov 2026

In short: Feria de Zaragoza has more than 360,000 m² and 11 pavilions, its 2027 season opens with ENOMAQ on 26 January, and each fair publishes a short, fixed build-up window that ends with a decoration-only day.

Frequently asked questions

Do you build stands at Feria de Zaragoza?

Yes. We design and build custom and modular stands for exhibitors at Feria de Zaragoza, with turnkey delivery from design to dismantling, and we reply to every brief within 24 hours.

Which fairs are held at Feria de Zaragoza in 2027?

ENOMAQ (26 to 28 January), SMAGUA and SPAPER (16 to 18 February), CITY.360 (17 and 18 February) and FIGAN (16 to 19 March), according to the organizer’s website.

Is FIMA held in 2027?

No. The organizer promotes the next edition as FIMA 2028, so the agricultural machinery fair is not on the 2027 calendar.

Can machines enter the halls on the last build-up day?

No, not at SMAGUA or FIGAN 2027. The final build-up day is reserved for stand decoration, and vehicles are not allowed into the halls.

Can the organizer change my assigned space?

Yes. The participation rules allow Feria de Zaragoza to change the location or shape of an assigned space for technical or organizational reasons, so we confirm the final plot before production.

What is the minimum price for a stand?

Stands start from €120/m². Space rental and venue services are paid separately to the organizer.

Discuss your stand brief

Tell us which Feria de Zaragoza fair you are planning, your plot size and what you will show. Discuss your stand brief or request a stand proposal.

More from Adam Expo Stand: Medium · Substack · LinkedIn