Fira de Barcelona Venue Sheet: Gran Via and Montjuïc Halls and Rules

Fira de Barcelona runs two venues: Gran Via, with 240,000 m² of gross exhibition area in eight halls, and Montjuïc, with 153,000 m² in seven halls. At both, the venue’s technical regulations allow stands up to 5 m high where the hall allows it, cap platforms at 18 cm, and treat anything taller, double-deck or rigged in a complex way as a “complex structure” that needs a signed technical project.

Last updated: 24 Nov 2026

This is a reference sheet, not a sales page. Every figure comes from Fira de Barcelona’s own website or its technical regulations, and the source is linked next to it. Where Fira publishes no venue-wide figure, we leave the item out instead of estimating. This is our own independent summary, not a Fira de Barcelona publication. Fira’s documents and your event’s participation regulations always prevail.

Which documents apply?

Fira de Barcelona publishes one set of technical regulations per venue: the Gran Via Technical Regulations and the Montjuïc Technical Regulations. Both are listed on Fira’s participation regulations page. Each event adds its own participation regulations, and several limits below, height included, “may vary depending on the event regulations published in the exhibitor area” (Technical Regulations 3.3.1). Any documentation the regulations ask for must be in English, Spanish or Catalan (3.1.1).

The two venues at a glance

Item Gran Via Montjuïc Source
Gross exhibition area 240,000 m² 153,000 m² Fira: Gran Via; Fira: Montjuïc
Halls 8 7 Same pages
Parking places 4,580 1,900 in the vicinity Same pages
Other A new 60,000 m² two-storey building is under construction Built in 1929 for the Barcelona International Exhibition Same pages

Gran Via halls: reference table

Source for every row: Gran Via Technical Regulations, 11.1 “Technical information”. Figures are copied as Fira prints them. Door sizes are height × width.

Hall Area (m²) Dimensions (m) Height to beam (m) Height to arcade (m) Columns Max floor load (kg/m²) Doors Door H × W (m)
Hall 1 14,000 102-51 × 203 10 – 29 3,000 5 5.8 × 6.7
Hall 2 32,000 90 × 393 13.4 5.2 146 5,000 / 1,800 20 4.2 × 5
Hall 3 43,000 95 × 415 10.44 8.9 46 5,000 16 5 × 6
Hall 4 20,000 81 × 218 10.44 8.9 18 5,000 8 5 × 6
Hall 5 17,000 91 × 202 11 – 40 3,000 9 6 × 6
Hall 6 20,000 81 × 220 10.44 8.9 18 5,000 8 5 × 6
Hall 7 17,000 91 × 202 11 – 40 3,000 9 6 × 6
Hall 8.0 14,000 79 × 174 6.70 – 42 3,500 3 6 × 4.75
Hall 8.1 10,500 79 × 161 10 – 16 1,500 – (5 goods lifts, 3.5 / 6.0 t) –
Link 4-5 (as labelled) 3,370 37 × 94 5.20 – 25 1,000 1 width 9.4
Link 5-7 1,870 37 × 62 5.20 – 17 1,000 1 width 9.4

The same table lists cooling, heating and air change as available in every hall, and compressed air at 6.5 bar through the service ducts.

Montjuïc halls: surface areas

Source: Montjuïc Technical Regulations, section 11 venue overview. Fira publishes surface areas for Montjuïc but no hall-by-hall table of heights, columns or floor loads, so we only give areas.

Space Area (m²)
Hall 1 13,400
Hall 2 24,000
Hall 4 10,300
Hall 7 6,300
Hall 8 19,000
Plaça Univers 16,700
Palau de Congressos de Barcelona 5,500

Stand rules at a glance (both venues)

These rules appear in both technical regulations with the same section numbers. Differences between the venues are marked. Your event’s own rules can change them.

Item Official figure Source
Maximum stand height 5 m, if the stand’s proportions and the hall height allow it and visibility is not blocked. Above 5 m the stand is a complex structure. GV 3.3.1; MJ 3.3.1
Gran Via link areas 4-6 and 5-7 Maximum stand height 5.2 m, construction height 4 m. Keep the path of the smoke curtains, which drop to 2.50 m, clear. GV 3.3.1
Gran Via Halls 2 and 3, under the walkway Construction limited to 4 m when the whole stand sits under the walkway. If only part of it does, the stand may keep one height up to 5 m. GV 3.3.1
Platform height Never more than 18 cm above the hall floor GV / MJ 3.3.3
Ramps Minimum width 1.20 m; maximum slope 10% under 3 m long, 8% under 6 m, 6% otherwise. A ramp at least 1 m wide is mandatory once a platform is 5 cm or higher. GV / MJ 5.8
Complex structures Stands over 5 m, double-deck stands with access to the upper floor, platforms or stages 0.50 m or higher, public tiered seating, outdoor builds over 16 m² and complex rigging GV / MJ 3.4
What a complex structure needs A project signed by a certified technician (a statement of liability is accepted), with structural study, use load per CTE DB SE table 3.1 category C, internal wind pressure 0.125 kN/m² up to 4 m and 0.063 kN/m² above, plus a final structural solidity certificate before opening. An evacuation and fire-detection plan is needed above 100 m². GV / MJ 3.4
Fire reaction of materials Walls and ceilings C-s2,d0; flooring EFL; hanging textiles class 1 under UNE-EN 13773:2003. Fire certificates must come from an accredited laboratory and be no more than 5 years old. GV / MJ 1.4
Ceilings A stand ceiling must not be completely closed. Closed ceilings up to 6 m that trap smoke need smoke detectors and a CE fire alarm, at least one detector per 60 m². GV / MJ 3.3.2, 5.9
Mesh ceilings without detectors Textile mesh rated M0, M1 or M2 (Euroclass A, B or C) with openings of at least 2 × 4 mm or 3 × 3 mm; metal mesh with openings of at least 10 × 10 mm GV 5.9
Double-deck or over 100 m² enclosed A professional smoke detection system to UNE 23007-14:2009, connected to the Fira control centre through a device hired from Servifira GV / MJ 5.9
Hall structure No loads on hall walls, columns or installations, no use of a neighbour’s walls, and no drilling, screwing or nailing into walls, ceilings, floors or columns GV 3.1, 5.7

Deadlines before build-up

  • Free-design project: for events Fira organises, a stand built by an independent contractor needs its project (layout, elevations) approved by Fira’s Operations Department in advance. The regulations give no fixed number of days, so check your event’s rules (GV 3.3).
  • Services: two weeks before build-up. Only goods and services ordered at least two weeks before build-up are guaranteed, and unpaid orders are not processed (GV 6.8). Water and drainage and compressed air follow the same two-week rule (GV 5.1, 5.2).
  • Power above 63 A or a dedicated service line: request it from Servifira two weeks before build-up (GV 6.4).
  • Extra build-up hours: ask the Fira Hall Manager before 12 pm on the day of the extension (GV 10.1.1).
  • Power after shutdown: request it 24 hours before the final show day (GV 6.7).

For worked examples with show dates, see our Fira Barcelona Gran Via technical guide.

Electrical installation

From section 6 of the Gran Via Technical Regulations. The Montjuïc regulations set the same voltage, legalisation and switchboard rules.

  • Supply is 400 V between phases and 230 V phase to neutral, with a power factor (cos φ) between 0.95 and 1.
  • The installation must be done under Spain’s low-voltage regulations by an electrician authorised by the Generalitat de Catalunya.
  • Stands up to 50 kW need a technical report with an electrical diagram. Above 50 kW you need a project from a licensed engineer, stamped by the Catalan engineers’ association. Generators over 10 kVA must also be legalised.
  • At Gran Via, connections up to 63 A use CEE 3P+N+E 6h sockets at 16, 32 or 63 A. Above 63 A the board connects to a Fira service line.
  • Board: main breaker, no fuses, and a 30 mA RCD on lighting circuits and outputs under 32 A and on any equipment the public can reach. IP4X indoors, IP45 outdoors, fixed between 1 m and 1.80 m high.

Rigging

Rigging points are installed only by Fira’s official provider and requested through Servifira (GV 3.7.3). Maximum load per point for exhibitors:

Venue / halls Max per point High-capacity point Source
Gran Via 1, 2, 5, 7, 8.0, 8.1 150 kg Yes, 250 kg GV 3.7.1
Gran Via 3, 4, 6 250 kg No GV 3.7.1
Montjuïc 150 kg (1.50 kN), and at most 15 kg per m² of stand – MJ 3.7.1
  • Hung trusses can go up to 7 m in the exhibition area, if the hall has no lower limit. With manual chain hoists the limit is 150 kg per point, and no truss grid may use more than 6 of them (GV / MJ 3.7).
  • Safety wires must be at least 6 mm and no thinner than the main wires. Secondary wires on equipment must be at least 4 mm, and nylon slings need at least 7 kN (GV / MJ 3.7.2).
  • Mixed structures, hung from points and also resting on the floor, are prohibited (GV 3.7.4). At Montjuïc, anchoring points must be at least 1 m apart (MJ 3.7.1).

We cover the design side in Rigging at Fira Barcelona Gran Via and Can an exhibition stand have a ceiling?

Access, loading and build-up hours

  • Build-up and dismantling dates and hours are set for each event in its participation regulations. Fira publishes no venue-wide standard hours, so we give none (GV 10.1).
  • Access to halls, loading and waiting areas is defined for each event on detailed plans. Private vehicles cannot enter during build-up and dismantling, and other vehicles may stay only while loading or unloading (GV 10.1.2, 10.2).
  • Vehicle categories for access fees: low (clearance up to 2 m), average (2–3.5 m) and high (over 3.5 m). No vehicle may stay overnight (GV 10.2).
  • Packaging must be out of the halls 24 hours before the event opens. After closing, exhibitors usually have one hour to vacate the halls (GV 10.3, 10.4).
  • Outdoor stands on avenues and squares must be dismantled within 48 hours of the end of the event (GV 10.1.3).
  • Non-EU goods clear the on-site customs office, code 0851 “Trade Fair” (GV 10.5). Underground parking at Gran Via has a 2 m access height (GV 10.6).

What this sheet leaves out

Standard build-up and dismantling hours, a fixed number of days for submitting the stand project, vehicle access fees and a hall-by-hall height, column or floor-load table for Montjuïc are not published by Fira as venue-wide figures. We have not estimated them. Check your event’s participation regulations for those items.

Related Fira de Barcelona pages on our site

Need a stand that passes Fira’s technical review first time?

Adam Expo Stand is based in Madrid, Spain, serving all of Europe with a focus on Spain and Portugal. The company was founded in 2018, Adam Dragos has worked in exhibitions since 2005, and we have delivered 639+ projects in 12+ countries. We design, build and install stands, and our fabrication is planned around the venue’s technical rules from the first drawing. As a rough guide, modular stands run approx. €280–380/m², custom wood approx. €450–650/m² and double-deck approx. €750–1,100/m²; your quote depends on the brief.

Send us your event, hall and stand size and we reply within 24 hours. Contact us for your Barcelona stand or see our Fira Barcelona Gran Via stand builder page.